297 <br /> <br />November 20, 1984 <br /> <br />- REPORTS FROM THE CITY MANAGER <br /> <br /> 84-435 - Letter from the City Manager recommending adoption of an ordinance to appropriat, <br />$40,000 to study needed improvements at the Godwin Street Pump Station to serve the U. S. Navy <br />and to authorize the City Manager to execute an agreement with the U. S. Navy for reimburse- <br />ment of costs. (See letter below) <br /> <br /> On motion of Mr. Beamer and <br />on first reading, and authorization was granted to execute an agreement with <br />for reimburse of costs, as~requested, and was adopted by unanimous vote: <br /> <br />seconded by Mrs. Webb, the following ordinance was approved <br /> the U. S. Navy <br /> <br />"AN ORDINANCE TO APPROPRIATE $40,000 FOR AN ENGINEERING STUDY OF THE GODWIN <br />STREET PUMP STATION IN CONNECTION WITH THE CONSTRUCTION OF THE SOLID WASTE <br />DISPOSAL PLANT AT THE NAVAL SHIPYARD; AUTHORIZING THE CITY MANAGER TO EXECUTE <br />A CHANGE ORDER TO EXISTING CONTRACT FOR ENGINEERING STUDY OF THE CITY WATER <br />DISTRIBUTION SYSTEM; AUTHORIZING THE CITY MANAGER TO ENTER INTO A CONTRACT <br />WITH THE UNITED STATES NAVY FOR REIMBURSEMENT." <br /> <br /> "During the developmental stages of the Refuse Derived Fuel Facility (RDF), the Navy and <br />the Public Service Authority were cautioned that their proposed site was located at a weak <br />point in the City of Portsmouth's water system. Analysis of Portsmouth's system by the Public <br />Utilities Department indicated that delivery of a large amounts of water at adequate pressure <br />could be a problem unless improvements to the City's system were made. Due to the timing of <br />their funding, the Navy proceeded with construction without fully resolving this question. <br /> <br /> In a letter to the City received on October 25, 1984, the Navy has requested that the Cit' <br />commission the engineering firm of CH2M-Hill to investigate what improvements will be necess; <br />to accommodate the RDF facility. The Navy has agreed to reimburse the City in full for ex- <br />penses to be incurred by CN2M-Hill. These expenses are now estimated to be $40,000.00. <br /> <br /> As you recall, CH2M-Hill developed the City's state approved master plan Yor the Public <br />Utilities Department. For this reason, the Navy feels that the investigation could be accom- <br />plished most expeditiously by the City's original consultant. <br /> <br /> Once the investigation is complete, it is quite possible that the Navy will approach the <br />City to design and construct the facilities required--again, at their expense. The Director <br />of Public Utilities can initiate a change order with CH2M-Hill for the proposed work. To <br />proceed, an application in the amount of $40,000 is required along with an agreement with the <br />U. S. Navy for reimbursement. <br /> <br /> Therefore, I recommend appropriation of the $40,000 and authorization to enter into an <br />agyeement with the U. S. Navy." <br /> <br /> 84-436 Letter from the City Manager recommending adoption of an ordinance to appropriat <br />$70,000 from 84-85 CIP for improvements to Sleepy Hole Golf Course and award of contract. <br /> <br /> The 1984-89 Capital Improvement Program earmarks $70,000 for construction of nine golf <br />cart paths at Portsmouth Sleepy Hole Golf Course. The front 9 holes were paved in 1983-84. <br />The purose of constructing the paths is to protect the golf course by restricting earts to <br />the paved paths during poor weather. Thus, not only can f~irway repair costs be reduced, but <br />rental revenues can also be increased by renting carts when they would otherwise have to be <br />kept off the course. <br /> <br /> In 1983, the course was closed to carts for 63 days. With cart revenues averaging $277 <br />per day, about $18,000 in revenue was lost, Following the completion ~f paths on the front <br />nine holes, days lost to cart rental decreased dramatically. Moreover, fairway reDair costs <br />have also decreased. <br /> <br />Bids were received on November 1, 1984 from one bidder, as follows: <br /> <br />Base Bid <br /> <br />Alternate Bid <br /> <br />Renfrow Construction Company $74,102.94 $69;752.94 <br />City Estimate 73,42~.40 69,866.40 <br /> <br /> The City Engineer anticipated a bid price for the base project which would exceed avail- <br />able funds, and he therefore advertised the bid with an alternate, which would delete an acces: <br />road from the park to the golf course. Based upon the bid received, the City Engineer recom- <br />mends award of a contract, with the access road deleted, to Renfrow Construction Company. <br /> <br /> The total cost of the project, including contingencies, contract administration and <br />inspection, is $73,173.28, which would require an appropriation of $70,000 as authorized in <br />the C!p. The remaining funds are available from previous appropriations for golf cart path <br />construction. <br /> <br /> Attached is the necessary ordinance to accomplish this task, and I recommend its approval <br />in addition to awarding a contract as specified above." ~ <br /> <br /> <br />