D~r~mhaw 11~ lq~4
<br />
<br /> 84-454 Letter from the City Manager recommending adoption of an ordinance ro appropria~
<br />$41,000 from the Capital Improvement Fund for preliminary design and engineering work on Capi
<br />Impyovement Projects.
<br />
<br /> "In order for the necessary preliminary design and engineering work to begin ~n projects
<br />scheduled in FY 84-89 of the approved 1984-89 Capital Improvement Program, the Director of
<br />Planning, Engineering and Inspections requests appropriatzon of funds as listed below:
<br />
<br />PROJECT APPROPRIATION ESTIMATED
<br /> REQUESTED PROJECT PROJECT
<br />
<br />(1) Mimosa Road Street Improvements $ 8,000 $350,000
<br />(2) Twin Pines Road Street Improvements $15,000 $685,000
<br />(3) Edinburgh Square Parking Garage $ 5,000 $200,000
<br />{4) Churchland Library Meeting Room $ 5,000 S 56,000
<br />(5) Dredging of Outfalls $ 5,000 *
<br />(6) Civic Center Non-Skid Floor $ 3,000 S 75,000
<br />
<br />*Definite estimate unavailabel
<br />at this time
<br />
<br />therefore, recommend appropriation of the requested funds."
<br />
<br /> On motion of Mr. Gray and seconded by Mr. Beamer, the following ordinance was approved
<br />on £irst reading, and by unanimous vote:
<br />
<br />"AN ORDINANCE TO APPROPRIATE $41,000
<br />LIMINARY DESIGN AND ENGINEERING WORK
<br />FOR FY 84-85."
<br />
<br />FROM THE CAPITAL IMPROVEMENT FUND FOR PRE-
<br />ON CAPITAL IMPROVEMENT PROJECTS SCHEDULED
<br />
<br /> 84-455 Letter from the City Manager recommending adoption of an ordinance to appropria
<br />$490,000 from the Capital Improvement Fund fog the Mid-City Drainage Project, Phase III.
<br />Motion to award contract to low bidders for construction contract and concrete pipe.
<br />
<br /> "In July~of 1979, construction began on the initial phase of the Mid-City/Westhaven/
<br />Mount Hermon drainage Improvements. The entire program, in three phases, provides for an
<br />upgraded storm system from the Caroline Avenue causeway near King Street to the north side~
<br />of the intersection of Frederick Boulevard and Turnpike Road. Bids were received on November
<br />13, 1984 for the final section and they are as follows:
<br />
<br /> SIDEWALK
<br />CONTRACTOR BASE BID ALTERNATE
<br />
<br />(1) Vico Construction Corporation
<br />(2) Suburban Grading & Utilities, Inc.
<br />(3) Rountree Construction Company
<br />(4) Inner-View, LTD.
<br />(5) Chesapeake Bay Contractors, Inc.
<br />(6) D.J.W. Construction, Inc.
<br />
<br />$282,455.91
<br />$349,919.00
<br />$391,193.20
<br />$372,818.5o
<br />$494,466.00
<br />$555,011.00
<br />
<br />$23,149.50
<br />$23,275.00
<br />$25,820.00
<br />.$aS¢~z5~oo
<br />$25,462.50
<br />$21,250.00
<br />
<br />City Esitmate
<br />
<br />$395,000.00
<br />
<br />CONCRETE PIEE
<br />
<br />(1) Empire Sales, Inc. $ 55,471,28
<br />(2) Lone STar Industries $ 56,175.68
<br />(3) Concrete Pipe & Products Co., Inc. $ 58,780.40
<br />
<br /> In addition to the completion of the drainage system, the above price also includes
<br />turn lanes on Frederick Boulevard at t~e Public Works Maintenance Facility, South Street,
<br />and King Street. The alternate bid is for installation of sidewalks along Frederick Boulevar~
<br />from Airline to Turnpike Where none presently exist.
<br />
<br /> The Director of Planning, Engineering and Inspections recommends award of the to~al pro-
<br />ject (including sidewalks) for a total project cost of $490,000 ~including materials, utili-
<br />ties, contingencies and engineering and inspection) as follows:
<br />
<br />Construction Contract ~Vico Construction Corporation)
<br />Concrete Pipe (Empire Sales, Inc.)
<br />Railroad Crossing
<br />Public Works
<br />Public Utilities
<br />
<br />$305,605'41
<br />$ 55,471.28
<br />$ 4,500.00
<br />$ 5,000.00
<br />$ 12,000.00
<br />
<br />Contingencies
<br />Engineering &
<br />
<br />Inspection
<br />
<br />$382,576.69
<br />$ 67,386.31
<br />$-40,037.00
<br />
<br />$490,000.00
<br />
<br />TOTAL ANTICIPATED PROJECT COST
<br />
<br /> Therefore, I recommend appropriation of the necessary funds and award to the ~ow Bidders
<br />for the construction contract and the concrete pipe."
<br />
<br />e
<br />:al
<br />
<br />e
<br />
<br />
<br />
|