<br />February 12, 1985
<br />
<br /> Velma Topping, 4618 South Street, representing Westhaven Areas Civic League~as President
<br />spoke in opposition.
<br />
<br />James N. Baker, 4602 Clifford Street, spoke against GHP 84-21.
<br />
<br /> Motion of Mr. Gray and second~d~by Mr. Beamer, ~hat GHP 84-21 be referred back
<br />Plannzng Commission £or additional consideration and further study, and was adopted
<br />vote.
<br />
<br />to the
<br />by unanimo
<br />
<br />(i) CA 85-1 A proposal to amend Section 40-121 of the City Code pertaining to dimen-
<br /> sional requirements in the Downtown D-1 District.
<br />
<br /> Motion of Mr. Whitlow and seconded by Mrs. Webb, that the amendment to Sactien 40-121 be
<br />denied,
<br />
<br /> Substitute motion of Mr. W~aitlow and seconded by Mr. Beamer, to defer CA 85-1 for a
<br />period of 60 days for further study, and was adopted by nmanimous vote.
<br />
<br />(j] 6R 85-2 = A proposal to amend Section 40-102 (B) of the City
<br /> parking requirements for the Port Norfolk Historic
<br /> district.
<br />
<br />Code pertamning to
<br />Residential zoning
<br />
<br /> Lewis Thomas, 131 Florida Avenue, representing Port Norfolk Civic League, spoke in suppor~
<br />of the code amendment. '
<br />
<br /> On motion of Mr. Gray and seconded by Mrs. Webb, ta concur in the recommendation of the
<br />Planning Commission, CA 85-2 was approved on first reading by unanimous vote.
<br />
<br />UNFINISHED BUSINESS
<br />
<br />85-2 Group Housing Application:
<br />
<br /> (d) GHP 84-24 - Group housing project application of the Portsmouth Redevelopment and
<br /> Housing Authority, by William Chick, President of Pepperdine Corpora-
<br /> tion, for construction of 31 Bpartments on the west side of Court Stree
<br /> betw?en Columbi~ and South Streets and special exception to the parking
<br /> requirements pursuant to Section 40-121 (B)(IV), deferred from the
<br /> Public Hearing of January 8, ~985.
<br /> David Cannon, 1501 London Boulevard, Architect fbr the Developer, stated that the proper
<br />number of parking spaces would be provided for the project.
<br /> to concur with the Planning Commission
<br />On motion of Mr. Whitlow and seconded by Mrs. We~b, GHP 84-24 for the construction of 31
<br />apartments on the west side of Court Street between Columbia and South Streets, was approved
<br />on first reading by unanimous vote.
<br />
<br />Council recessed at 9:29 p.m. and reconvened at 9:43 p.m.
<br />
<br />REPORTS FROM THE CITY MANAGER -
<br />
<br /> 85-42 Letter from the City Manager recommending adoption of an ordinance to appropriate
<br />$527,821 for drainage improvements in Westhaven Park and award contract to responsible low
<br />bidder.
<br />
<br /> "The 1984-89 Capital Improvement Program includes fundin~ for drainage and street
<br />men~s ~n the Westhaven Park area. Engineering design has been completed and bids were
<br />on December 18, 1984 for construction of the project as follows:
<br />
<br />improve-
<br />received
<br />
<br />EONTRACTOR
<br />
<br />BASE BID
<br />
<br />(1) Asphalt Roads ~ Materials, Inc. (Virginia
<br />(2) Vico Construction Corporation (Chesapeake]
<br />(3) Aldo Construction Corporation (Chesapeake)
<br />
<br />age
<br />
<br />Beach)
<br />
<br />City Estimate
<br />
<br />The above Base Bid is for providing new streets,
<br />for the streets highlighted on the attached map.
<br />
<br />curbsand
<br />
<br />$414,820.70
<br /> 481,930.81
<br /> 483,084.65
<br />
<br />$395,000.00
<br />
<br />~utter and the necessary drain~
<br />
<br /> Asphalt Roads and Materials, Inc.,
<br />pro~ects in the past for the City. Therefore,
<br />total costs as f~llows:
<br />
<br />the low bidder, has successfully completed several
<br /> we rec6mmend award to 4sphalt Roads with the
<br />
<br />Contract Price (Asphalt Roads
<br />Public Utilities
<br />Contingencies (15%)
<br />Engineering & Inspection
<br />
<br />& Materials, Inc.)
<br />
<br />TOTAL PROJECT EOST
<br />
<br /> The $15~,000 for u~ili.ties
<br />water system as a result
<br />
<br />'$4%.4,821.00 ,
<br /> 15,000.00
<br /> 60,000.00
<br /> 38,000.00
<br />
<br /> $527,821.00
<br />
<br /> is ,for anticipated relocations which will ha~e to be made to the
<br />of the construction.