Laserfiche WebLink
349' <br /> <br />February 12, 1985 <br /> <br /> Velma Topping, 4618 South Street, representing Westhaven Areas Civic League~as President <br />spoke in opposition. <br /> <br />James N. Baker, 4602 Clifford Street, spoke against GHP 84-21. <br /> <br /> Motion of Mr. Gray and second~d~by Mr. Beamer, ~hat GHP 84-21 be referred back <br />Plannzng Commission £or additional consideration and further study, and was adopted <br />vote. <br /> <br />to the <br />by unanimo <br /> <br />(i) CA 85-1 A proposal to amend Section 40-121 of the City Code pertaining to dimen- <br /> sional requirements in the Downtown D-1 District. <br /> <br /> Motion of Mr. Whitlow and seconded by Mrs. Webb, that the amendment to Sactien 40-121 be <br />denied, <br /> <br /> Substitute motion of Mr. W~aitlow and seconded by Mr. Beamer, to defer CA 85-1 for a <br />period of 60 days for further study, and was adopted by nmanimous vote. <br /> <br />(j] 6R 85-2 = A proposal to amend Section 40-102 (B) of the City <br /> parking requirements for the Port Norfolk Historic <br /> district. <br /> <br />Code pertamning to <br />Residential zoning <br /> <br /> Lewis Thomas, 131 Florida Avenue, representing Port Norfolk Civic League, spoke in suppor~ <br />of the code amendment. ' <br /> <br /> On motion of Mr. Gray and seconded by Mrs. Webb, ta concur in the recommendation of the <br />Planning Commission, CA 85-2 was approved on first reading by unanimous vote. <br /> <br />UNFINISHED BUSINESS <br /> <br />85-2 Group Housing Application: <br /> <br /> (d) GHP 84-24 - Group housing project application of the Portsmouth Redevelopment and <br /> Housing Authority, by William Chick, President of Pepperdine Corpora- <br /> tion, for construction of 31 Bpartments on the west side of Court Stree <br /> betw?en Columbi~ and South Streets and special exception to the parking <br /> requirements pursuant to Section 40-121 (B)(IV), deferred from the <br /> Public Hearing of January 8, ~985. <br /> David Cannon, 1501 London Boulevard, Architect fbr the Developer, stated that the proper <br />number of parking spaces would be provided for the project. <br /> to concur with the Planning Commission <br />On motion of Mr. Whitlow and seconded by Mrs. We~b, GHP 84-24 for the construction of 31 <br />apartments on the west side of Court Street between Columbia and South Streets, was approved <br />on first reading by unanimous vote. <br /> <br />Council recessed at 9:29 p.m. and reconvened at 9:43 p.m. <br /> <br />REPORTS FROM THE CITY MANAGER - <br /> <br /> 85-42 Letter from the City Manager recommending adoption of an ordinance to appropriate <br />$527,821 for drainage improvements in Westhaven Park and award contract to responsible low <br />bidder. <br /> <br /> "The 1984-89 Capital Improvement Program includes fundin~ for drainage and street <br />men~s ~n the Westhaven Park area. Engineering design has been completed and bids were <br />on December 18, 1984 for construction of the project as follows: <br /> <br />improve- <br />received <br /> <br />EONTRACTOR <br /> <br />BASE BID <br /> <br />(1) Asphalt Roads ~ Materials, Inc. (Virginia <br />(2) Vico Construction Corporation (Chesapeake] <br />(3) Aldo Construction Corporation (Chesapeake) <br /> <br />age <br /> <br />Beach) <br /> <br />City Estimate <br /> <br />The above Base Bid is for providing new streets, <br />for the streets highlighted on the attached map. <br /> <br />curbsand <br /> <br />$414,820.70 <br /> 481,930.81 <br /> 483,084.65 <br /> <br />$395,000.00 <br /> <br />~utter and the necessary drain~ <br /> <br /> Asphalt Roads and Materials, Inc., <br />pro~ects in the past for the City. Therefore, <br />total costs as f~llows: <br /> <br />the low bidder, has successfully completed several <br /> we rec6mmend award to 4sphalt Roads with the <br /> <br />Contract Price (Asphalt Roads <br />Public Utilities <br />Contingencies (15%) <br />Engineering & Inspection <br /> <br />& Materials, Inc.) <br /> <br />TOTAL PROJECT EOST <br /> <br /> The $15~,000 for u~ili.ties <br />water system as a result <br /> <br />'$4%.4,821.00 , <br /> 15,000.00 <br /> 60,000.00 <br /> 38,000.00 <br /> <br /> $527,821.00 <br /> <br /> is ,for anticipated relocations which will ha~e to be made to the <br />of the construction. <br /> <br /> <br />