My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes 12/12/1989
Portsmouth-City-Clerk
>
Minutes
>
1980s
>
Year 1989
>
Minutes 12/12/1989
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/10/2001 6:51:03 PM
Creation date
8/10/2001 6:14:02 PM
Metadata
Fields
Template:
City Council
City Council - Type
Adopted Minutes
City Council - Date
12/12/1989
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
December 12, 1989 <br /> <br /> "~ April of 1987, Council ~appropriated $621,465 f <br />installation of underground electrical utilities by Vir <br />in the ~ortCentre area. Authorization to.proceed was g <br />Virginia Power but no work was completed. Earlier this <br />Virginka~P~wer reassessed their estimate on thi~ projec <br />in~reasek their cost to nearly al.4 million. W_th this <br />the Director of Public Works to inw~stig!ate <br />[ty of the City bidding the work. <br /> <br />ho~se" <br /> <br /> result~ ~n the last three months, we ]ave des <br /> d bid tnt complete underground duct ba!~k netwc <br /> circuits for the PortCentre project. ?o compl <br /> we will still have to rely on Virginia Power <br />~g at an estimated cost of approximatel~ $338, <br /> for an internal design cost ~o the En( <br /> with an additional $28,000 anticipated <br /> ~ation, we anti-cipate a savings of <br /> <br />~r the <br />~inia Power <br />iven to <br />year, <br />and <br />increase, <br />the <br /> <br />igned &in <br />rk and <br />~te this <br /> install <br /> <br /> staff of <br />for co~ tract <br />oximately <br /> <br />pr93ec <br />2.11A <br />th~s p <br />to,all <br /> <br /> T <br />instal <br /> <br />unAnimbu~ <br /> <br />of <br />Pod(sm <br />22+613 <br />pr~is <br /> } <br />that C <br />re~ir <br />st~te <br />holida <br />YeaF's <br />Christ <br /> <br /> No. 1 are the results of the install mtion bids <br />on November 30, 1989 and the material )ids conduit) <br />on December 4, 1989. The total cost of comple this <br />Ls anticipated at $927,943 as itemized on Attac No. <br />shown on Attachment No. 2 is a comparison of the cost of <br />iect versus the cost of the project being completed <br />)y Virginia Power. <br /> <br /> Director of Public Works recommends award of t <br />zion contract to Dorey Electric and app~opriati <br />~1 funding of $306,478 in addition to the or~g~ <br /> in 1987 (final approval to be given on second <br /> is identified in FY 89-90 of the 1989-.94 Capit <br /> nt Program. The Director of Public Wor~s also <br /> ~he material bid to Westinghouse Elec~ Tic Supp <br />~rchase the PVC electrical conduit one re <br /> <br />herefore, concur and recommend <br /> of the low bids to Dotty Electric and <br /> <br /> of Mr. Simpson and seconded by <br />ordinance was approved on first readi <br />vote: <br /> <br /> ORDINANCE TO APPROPRIATE $306,478 FROM <br /> FUND FOR UNDERGROUND ELECTRIC~ <br />?ORTCENTRE INiUSTRIAL PARK." <br />78 - Letter ~rom the City Manager recol <br />~inance to amend Chapter 22 of the Code <br />th, Virginia, 1988, as amended, by amen. <br />]d 22-643 thereof, pertaining to hours, <br />~s for parking meters and metered parkil <br /> <br />~ntly an individual Was given a ticket <br />~r on Columbus Day. The individual was <br />~mbuS Day waS a legal City holiday, and <br />to pUt mOney into the meter, The City <br />at payment is required except on Sunday~ <br />I. The POrtsmouth City Code currently i <br />~y, Fourth of July, Labor Day, Thanksgi' <br />~ Day as legal-holidays as it relates t. <br /> <br /> on of the <br /> hal fundinc <br /> reading). <br /> <br /> recommends <br /> ly Company <br /> ading <br /> <br /> ~tion cf $306,478 <br /> to Westinghouse <br /> <br />7. Barn(s, the <br />~g, and by <br /> <br /> THE CAPITAL <br /> INSTALLATION <br /> <br />nending adoption <br />of the ~ity of <br />ling sections <br />days and <br />~g lots. <br /> <br />~or parking at a <br />of the opinion <br />as such, was not <br />s parking meters <br />~ and ls al <br />]entifie : New <br />~ing Day and <br />) parking meters. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.