Laserfiche WebLink
August.27, 1991 <br /> <br /> "The 1990-91 Capital Improvement Plan authorized $2 <br />continued funding for asbestos removal in City owned bui <br />In 1990, BCM Engineering completed a facilities study an <br /> <br />sampling' <br />containin. <br /> <br /> Usin. <br />Director <br />the follo <br /> <br />cementiti <br /> <br />insulati¢ <br /> <br />pipe fitt <br /> 6. <br /> <br /> e <br /> <br />fitting <br /> <br /> Bid <br />listed lo <br />is furthe <br />the cont~ <br />Virginia. <br /> <br /> Resi <br />combined <br />complianc <br />specifica <br />plans and <br />Churchlan <br /> <br /> I co <br />in the am <br />With your <br />Improveme <br /> <br /> Addi <br />readings <br />recommend <br />September <br /> <br /> Moti <br />following <br />September <br /> <br />"AN <br />CAPI <br />ASBE <br />CHUR <br /> <br /> 91-2 <br />of an ord <br />Portsmout <br />pertainin <br /> <br />chich documented the presence and condition of <br /> material in each building. <br /> <br />the information provided in the facilities st <br />f General Operations recommends abatement of a <br />~ing locations: <br /> <br />~ity Garage pipe fittin~ insulation and <br />)us board <br /> <br />?ublic Works Field Office cementitious board <br /> <br />2ity Hall elevator floor tile and generator <br /> <br />~neral District Court - floor tile <br /> <br />qaval Museum (2nd floor) - acoustical ceiling <br />lng insulation <br /> <br />0,000 for <br />dings. <br />air <br />~sbestos <br /> <br />[dy, the <br />~bestos in <br /> <br />om <br /> <br />p.aster and <br /> <br />lain Library - acoustical plaster, wire lath <br /> <br />qeighborhood Facility - pipe insulation and pip~ <br />~sulation ~ ~ <br /> <br />?ublic Health Building - floor tile and mastic~ <br /> <br />have been received for abatement of the asb6st~s <br />~ations and an analysis is attached for your re <br />~ recommended by tne Director of General Ope~at <br />~ct be awarded to Nash Construction Company of <br /> <br /> ual funds remaining from prior appropriations <br />~ith this appropriation to pay BCM Engineering <br />monitoring and the ~reparation of plans and <br />~ions for each bui]dingl Additionally, BCM ~il <br /> specifications for asbestos abatement o~ the <br /> ~igh School. <br /> <br />acur with these recommendations and request ap~ <br />punt of $200,000 and award of the b~d to the lc <br />approval of this item, the balance in the capi <br />nts Fund will be $~,334~868. <br /> <br />tionally, in accordance with your direction ~o <br />Dn appropriations for the benefit of the public <br />your deferral of this item until the meeting <br />t0, 1991." <br /> <br />~n of Mr. Epperson and seconded by Mr. Clemons, <br />ordinance was deferred to the Regular Meeting <br />10, 1991, and by unanimous vote. <br /> <br />)RDINANCE TO APPROPRIATE $200,000.00 FROM THE <br />rAL IMPROVEMENTS FUND FOR THE REMOVAL OF <br />~TOS FROM CITY OWNED BUILDINGS AND THE CURRENT <br />IHLAND HIGH SCHOOL BUILDING.~ <br /> <br />~7 Letter from the City Manager recommending <br />inance to amend Chapter 12 of the code of the <br />n, Virginia, 1988., by adding Section 12-18 the~ <br /> to compensation of jurors. <br /> <br /> at the <br />,lew. It <br />.ons that <br />~ichmond, <br /> <br />~ill be <br />~or <br /> <br />prepare <br />isting <br /> <br />?opriation <br /> bidder. <br />:al <br /> <br />lave two <br /> I <br /> <br />~doption <br />[ty of <br />)of~ <br /> <br /> <br />