Laserfiche WebLink
72. <br /> <br />November 23. 1971 <br /> <br /> This plan sets forth an orderly sequence of operations and takes into consideration <br />such factors as: <br /> <br />(1) Typesi'pf impMo~e~n~s and their inter-relations. <br /> <br />(2) Seasonal requirements for the type of work. <br /> <br />(3) School year and its effect on adjacent work. <br /> <br />(4) Minimum disruption of residential areas by the work, <br /> although some disruption is inevitable. <br /> <br /> Also, prices have gone up considerably since initial cost estimates were made. <br />Additionally, estimates were made without benefit of detailed plans and probably are <br />quite lower than currently may be the case. <br /> <br /> We have already resurfaced Leckie Street, east to the project's western boundary; <br />Spratley Street, east to the western boundary; Fort Lane, north.to the southern boundary; <br />and, Him Avenue, south of Holladay Street, at a total cost of $8,000. <br /> <br />Here are the improvements scheduled and proposed timetable for accomplishment: <br /> <br /> Roadway demolition <br />to the southern limits; <br />Armstrong to Elm. <br /> <br />is scheduled in January, 1972 along Armstrong Street, from Blair <br />along Blair, from Owens Street to Hlm Avenue; and, Holladay, from <br /> <br /> In July, 1972, demolition will proceed along Armstrong Street, between Leckie and Spratl~y. <br />In May, 1975, there will be demolition along Harrell Street, from Elm Avenue to Webster. <br />Other demolition would occur in June, 1975, along Butler Street, Lane and Williams Streets, <br />and the west end of "A" Street. Demolition along Primrose Street, from "B" to Holladay, <br />would occur in September, 1975. <br /> <br /> We would begin survey work for storm drains in January, 1972 along the southwest boundar~ <br />of the project and the following month along Ann and Armstrong Streets. Planning work for <br />the southwest boundary would be from February through April, with construction from June <br />through September. <br /> <br /> Construction work on Ann Street would begin in May and on Armstrong in July. Drainage <br />work at the north end of Owens Street would begin in August and we could expect to let the <br />north boundary contract in October and complete the job in December. <br /> <br /> Storm drains <br />with construction <br />September, 1973. <br /> <br />east of the Park View Elementary School would be contracted in,April, 1974, <br />in May and June. The survey work for this project would be completed in <br /> <br /> Our survey work for sanitary sewers also would begin in January, 1972, the planning <br />in February, and contract award in June. Construction should then start in July. <br /> <br /> Water and gas lines' installation is planned <br />and water lines along Hotladay Street, from Fort <br />end of Owens Street in July, 1972. <br /> <br />along Armstrong Street during May, 1972, <br />Lane to Hatton Street, and at the north <br /> <br /> Water line installations also are planned in April, 1975 along "A" Street, from Blm <br />Avenue to Williams, and along Williams Street in May and June, 1973. Similar work would <br />be accomplished along Parkview, Riverview and Linden Avenues in March, 1973, and along Harre] <br />Street in April. <br /> <br /> The schedule for street construction and new walks begins on Armstrong Street during <br />July and August, 1972; the north end of Owens in August and September; Park View and Rivervie <br />Avenues in April, May and June, 1975; Linden Avenue in APril and May, 1975; Harrell Street <br />in April and May, 1975; Butler, Lane and Williams, and ,A" Street to the west end, in June, <br />July and August, 1973; West Ann Street and south Owens' construction would be from May throu <br />August, 1974. ~ <br /> <br /> Other walks, unassociated with the street construction pro~ram, w0uld be constructed I <br />at Primrose in October, 1973; Him to Armstrong~ SePtember, ~1973, Hatton to Holladay, October,! <br />1973; Owens and Butler, during June, July and August, 1973. ~ <br /> <br /> All other streets not heretofore specifically listed, but which will be worked, will <br />be slurry sealed (a liquified asphalt)~ This-work will begin in June, 1972 and be completed <br />over a 2-year period. <br /> <br /> Construction of a parking lot on Elm Avenue will be started in JulY, <br />at "A" and Williams in June, 1975, and one east of the elementary school, <br />1974. <br /> <br />1972, another lot <br />starting in May, <br /> <br /> Our Recreation Department is prepared to develop a six-acre Park View playground and <br />a Blair Street playlot, the latter a small area encompassing about six lots. The development <br />plan for the two areas, as submitted in the project application, was ~used as a guide for <br />actual implementation of the plan. <br /> <br /> The Recreation. Director points out that size of the Park View playground, if desired, <br />can be reduced by amendment ito the application, but this would eliminate some of the importan <br />facilities planned. } <br /> <br /> <br />