My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1972 Ordinances
Portsmouth-City-Attorney
>
ORDINANCES
>
1972
>
1972 Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2001 6:44:12 PM
Creation date
6/27/2001 5:06:03 PM
Metadata
Fields
Template:
Ord/Resolutions
Year
1972
Ord/Resolutions - Type
Ordinances
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
by the Traffic Engineer. The subdivider shall pay the cost <br />of installation thereof and all costs to be incurred for the <br />operation and maintenance thereof during the first year follow~ <br />ing the co~ptetion of installation. <br /> <br /> (k) Bridge widths shall be compatible with the'width <br />of the pavement approaching the bridgeo Sidewalks shall be <br />provided on both si~es of bridges unless waived by the City <br />Engineer. Ti~er construction, including timber pilings <br />shall not be permitted. Bridges shall be designed for H-20 <br />loading (mininum). Architectural and ornamental work on <br />bridges shall be compatible with the area in which ~he bridge <br />is~located-and approved by the City Engineer. <br /> <br /> Culverts shall be designed in accordance with the <br /> Virginia Department of Highways design standards and details. <br /> Endwai!s shall be provided as reauired by the City Engineer <br />~and shall conform to Virginia Department of Highways standards <br /> or City standards. The developer shall provide for soil <br /> bearing investigations to determine foundation requirements. <br /> Pilings for culvert support shall be provided if needed. <br /> Ample waterway shall be provided for in culvert design, based <br /> on five (5) year storm recurrence and the drainage area <br /> served by the culverts. <br /> <br /> Ail engineering calculations, including soil test <br />results, shall be furnished to the City Engineer with submittal. <br />Approval by the City Engineer shall not release the developer <br />from the requirements fora safe and functional design. <br /> <br /> Developer shall be required to furnish all other <br />data pertaining to bridges and culverts which shall be deemed <br />necessary by the City Engineer. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.