My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1972 Ordinances
Portsmouth-City-Attorney
>
ORDINANCES
>
1972
>
1972 Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2001 6:44:12 PM
Creation date
6/27/2001 5:06:03 PM
Metadata
Fields
Template:
Ord/Resolutions
Year
1972
Ord/Resolutions - Type
Ordinances
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
409
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The cost of all physical improvements required by the <br />provisions of th~s section shall be paid by the subdivider. If <br />the actual installation of improvements is not completed prior <br />to the application made for final plat approval~ the subdivider <br />shall execute and file with the City Clerk an agreement and bond <br />in an amount equal to the estimated costs of such improvements, <br />g~aranteeing that the required improvements will be properly <br />and satisfactorily installed within a reasonable length of <br />time; but, in no event, more than two years. An irrevocable <br />letter of credit issued by a bank in a form approved by the <br />city attorney or a deuasit of funds in escrow may be accepted <br />in lieu of bond under the same terms and conditions applicable <br />to bonds. The bond, letter of credit or deposit may be re- <br />leased by the city when specific improvements covered by <br />the bond have been completed and approved by the city engineer <br />as being in accordance with city standards and specifications. <br /> <br /> In those instances in which any of the improvements <br />as required by this section could be-more conveniently installed <br />by the city or its agent, the city may, in its discretion, <br />accept payment of the total cost of such improvements in lieu <br />of actual construction or bond as required above. Such pay~ <br />ment will be set ~forth in an agreement approved by the city <br />attorney, which agreement will Set forth the conditions of <br />-payment and a time limit upon the use of such paymen-t by the <br />city, such time limit in no instance to exceed ten years. If <br />such payment is not utilized by the city within the agreed <br />time limit, itwill revert to the subdivider. <br /> <br /> No certificate of occupancy shall be issued for the <br />occupancy of any structure or building to be located in such <br />subdivision unless and until the. improvementsrequired herein <br />which are directly necessary to the use and enjoyment of <br />such structure have been installed and accepted by the city <br />except ~hat final roadway surface need not be applied prior <br />to issuance of suck certificate if a suitable base and in- <br />terim sealing agent acceptable to the city have been laid. <br /> <br />Section 32-22. Off-site drainage improvements. <br /> <br />Whenever the subdivision or development of !andmay <br />cause or contribute to the need for off-site drainage facilities <br />(facilities other than those required to provide internal <br />drainage within the subdivision or development) to control <br /> <br />-19- <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.