My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983 Ordinances
Portsmouth-City-Attorney
>
ORDINANCES
>
1983
>
1983 Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2009 3:42:46 PM
Creation date
6/22/2001 7:54:12 PM
Metadata
Fields
Template:
Ord/Resolutions
Year
1983
Ord/Resolutions - Type
Ordinances
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
210
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AN ORDINANCE TO A_~LEND SECTION 32-48 OF THE CODE OF THE <br />CITY OF PORTSMOUTH, VIRGINIA, 1973, PERTAINING TO SCHEDULE <br /> <br /> BE IT ORDAINED by the Council of the City of Portsmouth, <br />Virginia: <br /> <br /> 1. That Seotion 32-48 of the Code of the City of <br />Portsmouth, Virginia, 1973, be amended and reordained to <br />read as follows: <br /> <br />Section 32-48. Schedule of fees and charges. <br /> <br /> ('a) For each perra±t issued an inspection fee of nine <br />dollars ($9.00) plus sixty cents ~$0.60) per square yard <br />will be charged, except that the fee for utility poles will <br />be six dollars ($6.00) per pole. <br /> <br /> (b) For each permit issued, charges for repairing or <br />resurfacing will be 'levied in accordance with the following <br />schedule except as provided in {c) below: <br /> <br /> Minimum Charge <br /> and Charger Per <br />Type of Repaving/Resurfacing SG~are Yard* <br />Utility pole ~n pavement) ................ 3521.50 <br /> <br />Asphalt sidewalk ........................... 15.50 <br />Brick sidewalk-sand bed .................... 43.00 <br />Brick side~alk-concrete bed ................ 57.50 <br />Co~crete sidewalk .......................... 21.50 <br />Concrete street ............................ 32.50 <br />Surface treated-stone base ................. 20.00 <br />Asphalt on soil cement base ................ 27.50 <br />Asphalt on crushed stone base .............. 20.00 <br />Asphalt on stbne block or brick ............ 36.00 <br />Asphalt on concrete base ................... 49.00 <br />Any other paving 36 OO <br />Strip resurfacing between cuts longi- <br /> tudinally along street .......... O.60/lin. ft. <br />Curb lowering [see section 32-3) ...O.60/Iin ft. <br /> <br /> *For work in excess of one square yar~, area shall be <br />de~e'rmined to the nearest one--tenth (1/10) of a square yard. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.