My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983 Resolutions
Portsmouth-City-Attorney
>
RESOLUTIONS
>
1983
>
1983 Resolutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2009 3:38:51 PM
Creation date
6/22/2001 3:47:09 PM
Metadata
Fields
Template:
Ord/Resolutions
Year
1983
Ord/Resolutions - Type
Resolutions
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
214
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(vii) Provisions shall be made to use a crusting <br />or binding agent or a control technique which will affect <br />the same results on the coal storage piles which will keep <br />the opacity level below the stipulated levels in the Virginia <br />Air Pollution Control Board permit; <br /> <br /> (Viii) There shall be installed, opera~and main- <br />tained, an air quality monitoring system in the Cradock area <br />to monitor the dispursion of coal dust from the rail lines <br />and the terminal. The air quality shall meet the standards <br />established by the Virginia State Air Pollution Control Board; <br /> <br /> (ix) Ail coal handling and operational facilities <br />shall be designed to maximize dust suppression.~i_The tunnel <br />type coal reclaiming system is the only method of'operation <br />that is acceptable at this time. If for some reason, it is <br />found that this system is not feasible because of the soil <br />or water conditions of the site, an alternative system may be <br />considered by the Council of the City of Portsmouth. Any <br />alternative system must be acceptable in meeting all Virginia <br />State Air Pollution Control permit requirements; <br /> <br /> (x) Ail site runoff from areas of rail car storage <br />~nd dumping north of Paradise Creek and the coal pile shall <br />be collected in settlement/treatment ponds. Routine sampling <br />and analysis shall be conducted in accordance with the NPDES <br />permit from the Virginia State Water Control Board to insure <br />that the quality of water discharged from the site after treat- <br />ment meets the standards set in the permit;.: <br /> <br /> (xi) The coal storage pile shall have a base which <br />conforms to the requirements of the Virginia State Water Control <br />~oard, as stipulated in the permit; <br /> <br /> (xii) The o%~ner shall install test wells on site and <br />have them monitored to comply with Virginia State Water Control <br />~Board regulations for the protection of ground water; <br /> <br /> (xiii) No vehicular access to the site shall be per- <br />mitted on Victory Boulevard; <br /> <br /> (xiv) The movement and control of rail traffic through <br />the City shall be in a manner acceptable to the City or its <br />designated representative so as to minimize interference with <br />vehicle traffic on City streets. High speed railroad switching <br />system will be constructed to allow the unit trains %o track <br />into the facility at 15 miles per hour. This system will <br />assure that the George Washington Highway intersection will <br />be cleared in approximately 5 minutes. If such system does <br />not prove effective, the Council of the City of Portsmouth <br />reserves the right to insist upon an alternate method for <br />reducing peak period impacts which would include reducing <br />the number of rail cars per train or prohibiting rail traffic <br />from being operated in connection with the facility during <br />peak vehicle travel which is Monday through Friday from 6:30 <br />A. M. to 8:30 A. M. and 3:30 P. M. to 5:30 P. M.; <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.