Laserfiche WebLink
- 6 - <br /> <br />inspections required by the building code. <br /> <br /> (a) The minimum fee for any permit shall be fifteen <br />dollars (Si5.00). <br /> <br /> (b) Additional inspections may be required by the <br />inspector, where, in the inspector's judgment, such <br />inspections are necessary. Each reinspection shall <br />require a fee of twenty-five dollars ($25.00) to be paid <br />prior to said reinspection. <br /> <br /> (c) An administrative fee of seventy-five dollars <br />($75.00) shall be paid, in addition to any permit fees, <br />if work is begun without necessary permits or if <br />occupancy of the building occurs prior to the issuance of <br />a certificate of occupancy by the building official. <br /> <br />Section 7-132. Schedules-Building permits. <br /> <br /> (a)(2) Use Group B-Business, M-Mercantile, <br />R-Residential: <br /> <br /> a. For one hundred (100 square feet up to and <br />including two thousand (2,000 square feet, the fee shall <br />be five dollars ($5.00) per hundred (100) square feet or <br />fraction thereof. The minimum fee shall be fifteen <br />dollars ($15.00). <br /> <br />Section 7-133. Same-Electrical permits and inspections. <br /> <br />(a) The fees for electrical permits shall be as follows: <br /> <br /> (5) Additions or repairs: For each piece of equipment <br />connected and for each circuit or ~eeder installeQ, extended, <br />relocated or repaired the fee shall be: <br /> <br /> Fee <br />Amperes Conductor Size (Per Circuit) <br /> <br /> 0 31 ~14, 12, 10 $3.00 <br /> 31 60 ~8,4 4.00 <br /> 61 100 ~4,3,2 5.00 <br />101 200 91,0,00,000 10.00 <br />Over 200 9Over 000 15.00 <br /> <br />$5.00 per meter base <br /> <br />[6) Miscellaneous: <br /> <br />Pool inspection $15.00 <br /> <br />Pool grounding 15.00 <br /> <br /> <br />