My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990 Resolutions
Portsmouth-City-Attorney
>
RESOLUTIONS
>
1990
>
1990 Resolutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2009 3:37:22 PM
Creation date
6/18/2001 5:24:23 PM
Metadata
Fields
Template:
Ord/Resolutions
Year
1990
Ord/Resolutions - Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
165
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(b> <br /> <br />At Wesley Street and Chautauqua Avenue, a traffic <br />signal will be installed at the intersection and a <br />westbound turn lane and radius widening will be <br />installed at Wesley Street and Chautauqua Avenue; <br /> <br />(c) <br /> <br />Virginia Avenue will be improved by a northbound <br />extension of Virginia Avenue from Woodrow Street <br />northeast along the abandoned railroad right-of-way, <br />then connecting with Lee Avenue at Cleveland Street. <br />This will require pavement improvements at both ends <br />of the connection in addition to the necessary <br />property acquisition, all of which will be <br />undertaken by VDOT. <br /> <br /> 3. VDOT will not open the Western Freeway until the <br />temporary improvements in Port Norfolk identified above have <br />been completed and are being utilized for local traffic. <br /> <br /> 4. VDOT's schedule for the Port Norfolk Connector is as <br />follows: <br /> <br />(a) By the spring of 1991 the consultant selection <br /> process will be initiated by VDOT; <br /> <br />(b) By the summer of 1991 VDOT will select a consultant <br /> and initiate engineering design; <br /> <br />(c) By the summer of 1993 VDOT will hold a design public <br /> hearing; <br /> <br />(d) <br /> <br />By the spring of 1994 VDOT will initiate <br />right-of-way acquisition; <br /> <br />(e) By the spring of 1995 VDOT will advertise for <br /> construction bids; <br /> <br />(f) By the spring of 1998 construction will be <br /> completed. <br /> <br /> 5. VDOT shall proceed with the process for construction <br />of the Port Norfolk Connector according to the above schedule. <br />Although VDOT cannot guarantee progress according to this <br />schedule, VDOT agrees to use its best efforts and to do <br />everything reasonably possible to ensure that funding, <br />exclusive of urban allocation, is made available for this <br />project and that the work is completed in accordance with this <br />schedule. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.