Laserfiche WebLink
August 14, 1984 <br /> <br />will replace both systems <br /> <br /> I concur with staff's recommendation to use this method and to award a sole source con- <br />tract to Insituform East, Inc. Attached for Council's consideration is an ordinance for the <br />appropriation of $183,214." <br /> On ~ot-io~' of. Mrs. Webb and seconded by Mrs. Lucas, the following ordinance was approved <br />on first reading, and was adopted by unanimous vote: <br /> "AN ORDINANCE TO APPROPRIATE $183,214 FROM THE PUBLIC UTILITY CAPITAL IMPROVEMENT <br />~' FUND'FOR REHABILITATION WORK ALONG A 10" GRAVITY SEWER MAIN ALONG GREENWOOD DRIVE <br /> FROM VICTORY BOULEVARD TO BOLD STREET." <br /> <br /> 84-282 - Letter from the City Manager recommending adoption of an ordinance to appropria' <br />$183,000 for repair of the heating and air conditioning system at the Effingham Street Fire <br />Station. <br /> <br /> "The Number One Fire Station located on Effingham S~reet is presently heated by several <br />types of heating systems, all of which require a great deal of maintenance and operate very <br />inefficiently.. The air conditioning system is composed of a wide variety of components accum- <br />ulated over the years and contributes to the operational problems. The proposed improvements <br /> in a two-phase project to be completed by Spring of 1985. <br /> <br />Bids were received on August 2, 1984 as follows: <br /> <br />CONTKACTOR <br /> <br />BID PRICE <br /> <br />PERCENTAGE <br /> <br />(l) Mec~n%cal Energy Specialists, Inc. $153,000 118% <br />~(2) Pittman Mechanical Contractors 158,500 122% <br /> <br /> Engineer's Estimate 130,000 100% <br /> <br /> ,The,~i~feyence between the low bid and the ~st&~ate ~ a~r~b~tedbto~thetconsn'~nt's lo~ <br />estimate of the cost of asbestos removal involved in the demolition of the existing system. <br /> <br />The City Engineer recommends award to the low bidder, <br />appropriation of the necessary funds. Contingencies, <br />bring th? total anticipated project cost to $183,000. <br /> The to[al project cost is Calculated as follows: <br /> <br />Mechanical Energy Specialists, Inc. <br />Contingencies <br />Project Administration and Inspection <br /> <br />TOTAL ANTICIPATED~iPROJECT COST <br /> <br />Mechanical Energy Specialists, Inc., and <br />project administration and inspection <br /> <br />$153,000 <br /> 15,000 <br /> 15,000 <br /> <br />$185,000 <br /> <br /> Attached is an ordinance for the appropriation of $183,000 and I recommend its approval <br />and award of the contract to the low bidder." <br /> <br /> On motion of Mr. Gray and seconded by Mrs. Lucas, the following ordinance was approved <br />on first reading, and was adopted by unanimous vo~e: <br /> <br />"AN ORDINANCE TO APPROPRIATE $183,000 FROM THE-CAPITAl,IMPROVEMENT FUND'FOR <br />IMPROVEMENTS TO rHE HEATING AND AIR CONDITIONING SYSTEMS AT THE EFFINGHAM <br />STREET FIRE STATION.' <br /> <br /> 84-283 - Letrex from the City Manager recommending adopt&on of an ord&nance ~o appropriat <br />$1,405,000 for Phase II oT the Priority Action Pro,ram:to ihclude ~treets from Crawford to <br />Washington on High Street. <br /> <br /> -"On July 24, 1984, City Council approved on first reading an appropriation of $780,000 <br />for construction of the Riverfront Park and award of contract to the low bidder, Conrad <br />Brothers, Inc. Bids for Phase II have been opened for streetscape improvements to High Street <br />from Crawford ~o Washington Streets and Conrad Brothers, Inc., once again is the apparent low <br />bidder. ~ Tabulation of the bids is as follows: <br /> <br />Amount of Bid % of Bid <br /> <br />City Estimate <br />Conrad Brothers, Inc. <br />Aldo Construction Corporation <br />Surburban Grading ~ Utilities, <br /> <br /> The City Engineer has <br />status and hhe ability <br />apparent low bidder. <br /> <br />$1,400,000.00 <br /> 1,392,509.77 <br /> 1,728,237.89 <br /> 2,183,936.97 <br /> <br />100% <br /> 99% <br />123~ <br />155% <br /> <br /> investigated Conrad Brothers, Inc., with retard to bcth fihancial <br />to perform the work, and he recommends award of the contract ~o the <br /> <br />The anticipated project cost is as follows: <br /> <br />Cons~ructi6n Contract <br />Contingencies <br />Contract Administration <br />Public. Utilities <br />Traffic Engineering <br />Purchase of Lights <br />VEPCO Underground <br />Total Anticipated <br /> <br />(Ccnrad Brcthers, Inc.-) $1,392,510 <br /> 20-,490 <br /> Inspection 90,000 <br /> 36,000 <br /> 6,000 <br /> 145,000 <br /> 28,000 <br /> <br />Connection Fee <br />Project Cost <br /> <br />$1,905~000 <br /> <br /> <br />