My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes 06/24/2014
Portsmouth-City-Clerk
>
Minutes
>
2000s
>
Year 2014
>
Minutes 06/24/2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/15/2014 9:42:39 AM
Creation date
7/9/2014 10:55:13 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
13
PDF
View images
View plain text
June 24, 2014 <br />o Restoration of the sidewalks and replacement of the 16-inch water line <br />increased the original contract amount approximately $1.2 million. This water line was <br />not initially included to be replaced due to its relatively young age (installed in the late <br />1970s); however, excavation during the project showed significant deterioration of the <br />condition of the pipe and it was replaced. <br />o Installation of verges, including mondo grass and edging, reduces the <br />amount of impervious surface which assists the City in complying with stormwater <br />regulations. This increased the original contract amount approximately $413,268.00. <br />o Replacement of the storm sewer along Water Street and the associated <br />restoration of the roadway and sidewalks increased the contract amount approximately <br />$465,000.00. A significant section of this pipe had settled which required excavation <br />and replacement instead of relining. <br />o These changes in project scope have already increased the budget by <br />approximately 21 %. <br />• Given the age of the infrastructure we are replacing (80 to 100 years old), we <br />continue to encounter unknown field conditions such as unsuitable soils and conflicts <br />with other utilities -electric, gas, and telephone lines. With the amount of work <br />completed to date, our experience tells us we will encounter more field conditions that <br />will require additional work. <br />Financial Impact: <br />• Approval of the Resolution and anticipated future change orders may add <br />approximately $1,500,000 in additional expense to this project. <br />• The Design Engineer's original opinion of construction cost was $11,500,000; <br />however, actual bids came in at $9,867,599.00. With the increases already incurred <br />due to significant changes in scope and anticipated cost increases due to unknown field <br />conditions, the final cost for this project is estimated to be $13,821,417.00. While this is <br />approximately 20% greater than the original estimate, this amount includes substantial <br />infrastructure improvements not included in the original bid. <br />• Funds earmarked for project contingencies and for infrastructure improvements <br />are available in the Public Utilities Capital Budget and will fund this additional expense. <br />Recommended Action: <br />• Adoption of the proposed resolution to exceed the 25% limit of allowable change <br />orders to the Downtown Sewer and Water Rehabilitation Project contract to cover the <br />additional expenses due to the increased scope of work. Vision Principles: A Robust <br />Economy for working men and women and Neighborhoods and a Sense of Community. <br />Next Steps following City Council Action: <br />• Project will be completed to all design standards and finished streets and <br />sidewalks will be much improved than what currently exists in the downtown area. <br />Motion by Ms. Randall, and seconded by Mr. Moody, to adopt the following <br />resolution, and was adopted by the following vote: <br />"RESOLUTION AUTHORIZING THE DEPARTMENT OF PUBLIC UTILITIES TO <br />APPROVE CHANGE ORDERS TOTALING MORE THAN 25% OF THE <br />CONSTRUCTION CONTRACT WITH GASTON BROTHERS UTILITIES, LLC FOR <br />QUADRANT 1 OF THE DOWNTOWN MASTER UTILITY PLAN WATER AND SEWER <br />REHABILITATION PROJECT. <br />WHEREAS, a project budget of $11,500,000 was originally projected by the <br />City's Design Engineer for Quadrant 1 of the Downtown Master Utility Plan Water and <br />Sewer Rehabilitation Project; and <br />WHEREAS, a construction contract in the amount of $9,867,599 for replacement <br />of water and sanitary sewer lines and rehabilitation/replacement of storm sewer within a <br />16-block area of Downtown Portsmouth was awarded to Gaston Brothers Utilities, LLC, <br />in January 2013; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).