My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes 03/21/2006
Portsmouth-City-Clerk
>
Minutes
>
2000s
>
Year 2006
>
Minutes 03/21/2006
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/31/2006 7:42:02 AM
Creation date
3/29/2006 9:20:25 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
18
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />March 21. 2006 <br /> <br />Funding for New Court Complex <br /> <br />Our most significant capital challenge is the development of a new court complex, which <br />is the largest capital project in Portsmouth's modern history. We need approximately <br />$6.25 million to undertake the planning, preliminary engineering, and project design for <br />this project. This phase of the project will span two budget years. The current estimate <br />for courthouse construction and furnishings is another $58 million, and this number is <br />subject to change based on a number of variables. I am recommending that we <br />designate two cents ($0.02) of the recommended $1.38 real estate tax rate in the FY07 <br />and future budgets to provide the initial financial support for this project. With the <br />implementation of the courts complex, we must discuss the future of the Portsmouth <br />City Jail, and I recommend that we initiate this discussion during the next fiscal year. <br /> <br />Cost of Priorities <br /> <br />Our priorities are both very noble and necessary, but they carry a cost. The work that <br />we will undertake in the above priority areas will require significant new funding in the <br />budget for the next fiscal year and beyond, including: <br /> <br />. $6 million for increased funding for education <br />. $5.5 million to support the employee compensation package <br />. $3.2 million in additional debt service for capital projects <br />. $1.0 million from the two cents on the real estate tax rate to support the <br />courthouse development project <br /> <br />These are significant increases that we must include in the appropriations to support the <br />FY07 budget. At the same time, we are taking a number of actions to contain costs. <br />For example, the general fund budget includes no new net positions, our budget team <br />trimmed $2.2 million from requests submitted by our operating departments, and we <br />have budgeted $8.1 million in anticipated savings through projected employee turnover. <br /> <br />Revenue Resources <br /> <br />We can support the appropriation increase for priorities from a number of increases in <br />revenues in our budget. These include natural increases in established taxes and fees <br />through improvements in the economy and other forces, and new tax revenues as major <br />projects come on line, such as New Port, the APM Terminals of Virginia (also known as <br />Maersk), and the new Wal-Mart store scheduled to open later this year in Midtown. The <br />proposed budget also includes increases in water and sewer rates, the residential solid <br />waste fee, and the stormwater management fee to continue our investment in repairing <br />and replacing these facilities and improving services. <br /> <br />Portsmouth's water and sewer system is one of our greatest assets, and it provides a <br />strong foundation for implementing Council's Vision Statement, particularly the Robust <br />and Prospering Economy and the Neighborhood and Community Transformation <br />elements of the vision statement. Many of the components of our water and sewer <br />system are beyond their useful life and are in need of replacement. This is especially <br />true in our neighborhoods where some 75 percent are in such condition. Replacement <br />of these lines is a long-term, costly endeavor that will require us to gradually increase <br />water and sewer rates for years to come. To continue to meet our system's long-term <br />replacement needs, this budget recommends that we increase both the water and <br />sewer rates by $0.23 per 1,000 gallons. For the average residential customer using just <br />over 5,000 gallons per month, the average monthly increase is approximately $27.60 <br />per year or $2.30 a month. <br />
The URL can be used to link to this page
Your browser does not support the video tag.