property to a point near the gas tanks¢ install a transformer <br /> station at this location, run a 240 volt three phase overhead <br /> secondary line to the generator building, install metering <br /> equipment for on-peak and off-peak metering, install or have <br /> installed necessary switchin~ and load limiti~ devices and <br /> connections to the City's switchboard, and do other necessary <br /> work to complete the interconnection for the exchange of approx- <br /> imately 120 K~¥ of electricity which is the rated capacity of <br /> the two ~enerators now being ins~talled. <br /> 2. The Uompany proposes to install the interco~aecting lines <br /> and equipment for the City without asking the City for an sppro- <br /> priation of fu~ads to cover the cost of construction, and to ac - <br /> cept kilowatt hours of electricity at the rate statedin t~ee (~) <br /> below in payment for construction work as outlined in one (1) above <br /> until such time as the construction cost is offset after which the <br /> City will be paid by the Company for electricity received as stated <br /> in t~hree ($) below. <br /> The estimated cost of the interconnecti~nis $6,500. (to be ad- <br /> justed to act-~al cost after completion) and the estimated annual <br /> income to the City for i£V~q sold above the cost of K~i~ purchased, <br /> based on figures supplied by the sewage plant engineers, is between <br /> three and four thousand dollars. On this basis the interconnection <br /> cost would be offset in about one and one-half years. <br /> ~. The Co~qoany will pay the City for power purchased the same orice <br /> per k.w. he,ur as the Company will sell to the Sewage Disposal P%ant, <br /> as stated in Park I Sectima 2 of the City-CompaCtly contract, dated <br /> ~ay l$th, 19&7, or one cent (1¢~) per k.w. hou~ zor trausfers between <br /> 7 A.~. to 9 P.?,~. during each 24 hour period, ami one half cent (1/2~) <br /> per k.w. hour for transfers between the hours of 9 P.}~. and 7 A.~. <br /> during each 24 hour period. <br /> &o The Company will endeavor, if in,mediate acceptance is made of this <br /> proposal, to supply electric service to the plant for use du~ing the <br /> initial starting period when no sewage gas is available fc~ operation <br /> of the gas engine generators. <br /> ~e feel that this interconnectio;n will prove beneficial to the City <br />not only from the ineo~ derived, but from the fact that this proposal will provide a third <br />source of power for the operation o f the plant. <br /> If you concur that an interconnecti~n should be made and will furnish <br />us with a letter of authorization and acceptance, we will b~ve an interchange agreement pre - <br />pared for execution by the City and will proceed with construction of the connecting line. <br /> <br />,ruly, <br /> <br />A.L. Jameson, 2~anager." <br /> <br /> Eotion of Er. Houg~ton t o refer to the City Pians~er, City Attorney and City <br />Engineer to negotiate the beet possible contract v~th the Virginia Electric and Power Company <br />and submit to the Councm~-for approval, was adopted. <br /> <br />The relieving ordinance was placed on its first reading: <br /> <br />"A~N ORDINAS~CE TO A~.~END Ah~ RE-ORDEIN AN 0RDiNA~?CE ENTITLED <br /> 'AN ORDINANCE FIXING THE FEES, R~TS AND C~ARGES FOR TLrE <br /> USE AND SERVICES OF THE SEWAGE DISPOSAL SYSTE-~ OF T~E CITY, <br /> AND PROVIDING FOR THE COLLECTION T~REOF A;~D PRESCRiBInG <br /> PENALTIES FOR T~E NON-P¢~.IENT THEREOF' Adopted on October <br /> 19th~ 19~8.~ <br /> <br /> ~io~mon of ~r. Bturtevant to authorize the ~anager to proceed with ptans <br />and specifications for a new Police Station, ~ud a new Fire Station ~o replace the present <br />fire station on Sixth Ave., was adopted, <br /> <br />On motion a dj ourned. <br /> <br />City Clerk. <br /> <br />Approved <br /> <br />President. <br /> <br /> <br />