Laserfiche WebLink
June 14th, 1949. <br /> <br /> All of the above areas _were visited' and their sewerage.needs discussed <br />dUrzn.g the ~znsp~ctzon trzp Wednesday morning, Nay 25, by ~. Duke, ~.Houghton, ~ r. Bergeron, <br />N~. Hzte and o~selves. <br /> ~ The outlet systems are to be adequate for present and future require- <br />ments of the areas to be Served, and-the port~ons of the systems that will u~timately serve <br />areas outside the City a~e to be adequate f0r-such Se~vice~ <br /> The engineering services-proposed will include, (1) preliminary stu- <br />dies ~nd estimates to-determine the-mos~ suitable and economical-arrangement of the outlet <br />systems, t~unk sewers, and laterals, and (2) the detailed design, with preparation of plans <br />and specifications, for the outlet systems a~nd for the principal tr~J-uk sewers. In the prelim- <br />ina~y studies, consideration will ~be given to the lateral sewer a~rangements, insofar as they <br />affect and govern the a~u~angements of principal trunk sewers aud outlets. The services we pro <br />pose to furnish a~e more specifically described below: <br /> <br /> P~eliminar. y. <br /> <br /> As it has been some years since.the original general studies of the <br />comprehensive plan requirements for the area were made, it is desirable at ~this t i~ '60 bring~ <br />these studies up to date, insofar as they wilI affect hhe design of the~proposed improvements~ <br />These studies would include present and probable future .development of ~he areas involved,the <br />required capacities of various portions of the outlet system, th~ extent of the areas for whi~ <br />~dtu~e service should be provided, the general arrangement of the outlet systems, the most <br />economical and ~ suitable layouts for trunk and lateral sewers, and estimates o f the construc- <br />tion cost~ Six copies of a report embodying the results of the preliminary studies would be <br />fu~nished~ <br /> <br /> Design <br /> In ' ' i of <br /> con_neetzon wzth the des g~ ~he outlet systems and principal <br />tr~u~ks ewers, we propose plans and specifications, wzth the plans to consist of construction <br />d~awings~having plan and p~0file sheets for the pip~ lines at a horizontal scale of ~0 feet te <br />the inch, and plans, sectionS, and details of the necessary structures and e~uipmen~. <br /> <br /> ' - ' Our charges for the ~bove services would be a percentage ef the con - <br />st~uction cost, computed in accordance wi~h the following tabulatzon. <br /> <br />Co'st of Outlet Systems <br /> and <br /> Tru~k Sewers. <br /> <br />Engzneerzng Fee <br />in Per Cent of <br />Con. s.tructi on Cost <br /> <br />$500~000~ 4.8O <br />600,000. 4.36 <br />VO0,O00~ 4.24 <br />800,000._ 4.14 <br /> <br /> Necessary field surveys in connection with the preliminary studies and <br />design a~e included in the above percentage fees. <br /> 0u~ rough preliminary estimates ~di. cate t~t the con~t~ction cSst of <br />~utlet syst~s and p~i~cipa~ t~ s ewers is likely t o b~ between $600,000.~ and $700,000.~ <br /> ~Ve would eX~$c~payment to ~ m~de in 2ou~ instalments, as~f ollows: <br /> <br /> 1. ~500~'upon suEt~al of ~e repor~ on p~el~ina~ des$~ <br /> studies. <br /> 2. S5 per Cent 02 the reminder of ~e total'fee,~b~sed~ on the <br /> esti~teS in~uded ~ the~prel~na~ repe~t, upon 50 per <br /> completion of the des~ work. <br /> 3. A sec0nd'35 Per ce~t~ zns~ lmen$, equal to Installer No. <br /> upon subst~tial completion o f the desi~ work. <br /> 4. The rem~n~ portion of the total fee, based on the fi~ <br /> esti~tes ~de upon c~pletLon o f the desi~ workz If desire~ <br /> ~ the City, ~d if a sm~s$~tial pant of the wo~k desired <br /> e be constructed zEed~ately, we would ~e ~eea~le to asEg <br /> the peEc~nt~ge fee upon coat,etlon costs determzned f~om bid <br /> ~aB~ations for those pa~ts of the pnoject on w~ bids ~e <br /> ~ec~ived witch 60 days of the date of co~letion of the de- <br /> szgn servzces~ ~d upon ~e f~al est,&tee of ~st for those <br /> portions on which bide a~e not ~ecezv~d. <br /> <br /> The plans will b e prepared in a form similar to those for the PinUe~s <br />Point-Sewage T~eatment Plant, being ~ep~oduced photographically on linen f~om pencil drawings. <br />The specifications Will be. tYPed for reproduction by_the Ditto process. Six sets or'plans <br />and. SpecifIcatibns will be fu~ish&dunder the above design fee, ~ud additional sets, as need- <br />ed, will be furnished at actual reproduction cost. <br /> ~ It is understood ~hat the City will co-operate wi~ the Engineers <br />throughout the work, including the following major items: <br /> <br /> (a) Place at the disposal of the Engineers all available <br /> pertinent infoz'mation that the City may have or ~owhich <br /> it may have access. <br /> <br /> <br />