June 14th, 1949.
<br />
<br /> All of the above areas _were visited' and their sewerage.needs discussed
<br />dUrzn.g the ~znsp~ctzon trzp Wednesday morning, Nay 25, by ~. Duke, ~.Houghton, ~ r. Bergeron,
<br />N~. Hzte and o~selves.
<br /> ~ The outlet systems are to be adequate for present and future require-
<br />ments of the areas to be Served, and-the port~ons of the systems that will u~timately serve
<br />areas outside the City a~e to be adequate f0r-such Se~vice~
<br /> The engineering services-proposed will include, (1) preliminary stu-
<br />dies ~nd estimates to-determine the-mos~ suitable and economical-arrangement of the outlet
<br />systems, t~unk sewers, and laterals, and (2) the detailed design, with preparation of plans
<br />and specifications, for the outlet systems a~nd for the principal tr~J-uk sewers. In the prelim-
<br />ina~y studies, consideration will ~be given to the lateral sewer a~rangements, insofar as they
<br />affect and govern the a~u~angements of principal trunk sewers aud outlets. The services we pro
<br />pose to furnish a~e more specifically described below:
<br />
<br /> P~eliminar. y.
<br />
<br /> As it has been some years since.the original general studies of the
<br />comprehensive plan requirements for the area were made, it is desirable at ~this t i~ '60 bring~
<br />these studies up to date, insofar as they wilI affect hhe design of the~proposed improvements~
<br />These studies would include present and probable future .development of ~he areas involved,the
<br />required capacities of various portions of the outlet system, th~ extent of the areas for whi~
<br />~dtu~e service should be provided, the general arrangement of the outlet systems, the most
<br />economical and ~ suitable layouts for trunk and lateral sewers, and estimates o f the construc-
<br />tion cost~ Six copies of a report embodying the results of the preliminary studies would be
<br />fu~nished~
<br />
<br /> Design
<br /> In ' ' i of
<br /> con_neetzon wzth the des g~ ~he outlet systems and principal
<br />tr~u~ks ewers, we propose plans and specifications, wzth the plans to consist of construction
<br />d~awings~having plan and p~0file sheets for the pip~ lines at a horizontal scale of ~0 feet te
<br />the inch, and plans, sectionS, and details of the necessary structures and e~uipmen~.
<br />
<br /> ' - ' Our charges for the ~bove services would be a percentage ef the con -
<br />st~uction cost, computed in accordance wi~h the following tabulatzon.
<br />
<br />Co'st of Outlet Systems
<br /> and
<br /> Tru~k Sewers.
<br />
<br />Engzneerzng Fee
<br />in Per Cent of
<br />Con. s.tructi on Cost
<br />
<br />$500~000~ 4.8O
<br />600,000. 4.36
<br />VO0,O00~ 4.24
<br />800,000._ 4.14
<br />
<br /> Necessary field surveys in connection with the preliminary studies and
<br />design a~e included in the above percentage fees.
<br /> 0u~ rough preliminary estimates ~di. cate t~t the con~t~ction cSst of
<br />~utlet syst~s and p~i~cipa~ t~ s ewers is likely t o b~ between $600,000.~ and $700,000.~
<br /> ~Ve would eX~$c~payment to ~ m~de in 2ou~ instalments, as~f ollows:
<br />
<br /> 1. ~500~'upon suEt~al of ~e repor~ on p~el~ina~ des$~
<br /> studies.
<br /> 2. S5 per Cent 02 the reminder of ~e total'fee,~b~sed~ on the
<br /> esti~teS in~uded ~ the~prel~na~ repe~t, upon 50 per
<br /> completion of the des~ work.
<br /> 3. A sec0nd'35 Per ce~t~ zns~ lmen$, equal to Installer No.
<br /> upon subst~tial completion o f the desi~ work.
<br /> 4. The rem~n~ portion of the total fee, based on the fi~
<br /> esti~tes ~de upon c~pletLon o f the desi~ workz If desire~
<br /> ~ the City, ~d if a sm~s$~tial pant of the wo~k desired
<br /> e be constructed zEed~ately, we would ~e ~eea~le to asEg
<br /> the peEc~nt~ge fee upon coat,etlon costs determzned f~om bid
<br /> ~aB~ations for those pa~ts of the pnoject on w~ bids ~e
<br /> ~ec~ived witch 60 days of the date of co~letion of the de-
<br /> szgn servzces~ ~d upon ~e f~al est,&tee of ~st for those
<br /> portions on which bide a~e not ~ecezv~d.
<br />
<br /> The plans will b e prepared in a form similar to those for the PinUe~s
<br />Point-Sewage T~eatment Plant, being ~ep~oduced photographically on linen f~om pencil drawings.
<br />The specifications Will be. tYPed for reproduction by_the Ditto process. Six sets or'plans
<br />and. SpecifIcatibns will be fu~ish&dunder the above design fee, ~ud additional sets, as need-
<br />ed, will be furnished at actual reproduction cost.
<br /> ~ It is understood ~hat the City will co-operate wi~ the Engineers
<br />throughout the work, including the following major items:
<br />
<br /> (a) Place at the disposal of the Engineers all available
<br /> pertinent infoz'mation that the City may have or ~owhich
<br /> it may have access.
<br />
<br />
<br />
|