<br />April 26, 1977
<br />
<br /> Ail that certain_lot, piece or parcel of land, situate, lying and being
<br />in the City of Portsmouth, Virginia, bounded and described as follows:
<br />
<br /> Beginning at a point on the West right of way of First Street, said point
<br />being North 24~54'45" West 280.22 feet from the northwest intersection of
<br />First Street and Wythe street; thence continuing along the West right of way
<br />of First Street North 24~55't0" West 141.05 feet to the former South right
<br />of way of Bart Street; thence along the former South right of way of Bart
<br />Street South 87°10'20'' West 14.17 feet to the East right of way of Crawford
<br />$t~e~t Extended; thence along the East right of way of Crawford Street
<br />Extended South 05o54'00'' East 117.24 feet to a point; thence South 80~52'16"
<br />East 66.58 feet to the Point of Beginning. Said parcel contains 4,724.11
<br />square feet.
<br />
<br /> BE IT FURTHER RESOLVED that the City Manager be, and he hereby is, authorized
<br />to execute all deeds and docUments and complete all transactions incident to the conveyance
<br />of this property."
<br />
<br />Ayes: Early, Elliott, Holley, Oast, Wentz, Davis
<br />Nays: None
<br />
<br /> 77-139 - Motion of Mr. Oast and seconded by Mr. Wentz, to award contract to Aldo
<br />tion Corporation, in the amount of $21,617, being lowest responsible bid:~far~theqpa~king lot
<br />a=i~:h-m~Bffimgham Street Fire Station, was adopted by unanimous vote.
<br />
<br /> 77-140 "Bids were recently received by the Department of Engineering and Technical
<br />Services for Phase I of the Cradock Public Works Project. The bids received were consider-
<br />ably higher than the City's consulting engineering:firm had estimated. As a result the
<br />project was rebid with an amendment which lowered the original low bid from approximately
<br />$668,000 to $654,000. Additional changes and negotiations with the low bidder lead to a
<br />further reduction of $50,000 in construction cost and $54,000 in materials cost. The primary
<br />change to the project resulting from the above sequence of egents, was the reduction of the
<br />drainage system design criteria from a five year storm to that of a two year storm. This sti:
<br />represents a substantial improvement in drainage capacity for the project area, and in the
<br />opinion of the City Engineer, the two year storm criteria is satisfactory.
<br />
<br /> As a result of the delay encountered due to the higher than anticipated bids, the
<br />Economic Development Administration granted the City a five day extension of the required
<br />ninety day implementation period. With the extension, the City now has until Tuesday, May
<br />9, 1977, to begin work within the project area. Therefore, it is respectfully recommended
<br />that City Council award lowest responsible bids to:
<br />
<br />1) Central Builders (Installation)~
<br />2) Empire Sales, Inc. (Concrete pipe)
<br />5) Kaiser AluminUm (AlUminum pipe)
<br />4~ Armco Steel (ABS Truss Pipe)
<br />
<br />$654,000.00
<br />130,000.00
<br />13,700.00
<br />1,860.00
<br />
<br />Total $779.550.00
<br />
<br /> Some of the above prices may be further reduced due tO the design changes previously
<br />mentioned. However, these changes can be handled easily through Change ~orders and will not
<br />be affected by the bid amunts listed above. Sufficient funds for the award of the above
<br />contracts have been previously appropriated."
<br />
<br /> Motion of Mr. Wentz and seconded by Mr. Elliott, to award contracts to lowest responsibl,
<br />bidders, as stated above, and was adopted by unanimous ~ote.
<br />
<br /> 77-141 - On motion of Mr. Wentz and seconded by Mr. Oust, that the Quarterly Financial
<br />Report for the quarter ending March 31, 1977, in accordance with the City Code, to be re-
<br />ceived as information, was adopted by unanimous vote.
<br />
<br /> 77-142 - On motion of Mr. Wentz and seconded by Mr. Early, the following resolution was
<br />adopted, and by the following vote:
<br />
<br />"A RESOLUTION CHANGING THE LOCATION OF THE MAY 10, 1977 REGULAR SCHEDULED
<br />COUNCIL MEETING FROM THE COUNCIL CHAMBERS OF THE MUNICIPAL BUILDING TO
<br />T. A. WILLETT AUDITORIUM AT WOODROW WILSON HIGH SCHOOL FOR A PUBLIC HEARING
<br />ON THE PROPOSED 1977-78 ANNUAL BUDGET, COMMENCING AT 7:50 P. M., EASTERN
<br />DAYLIGHT TIME.
<br />
<br /> WHEREAS, it is the sense of the Council that the public should be provided with
<br />a place to assemble of sufficient size to permit the exchange of views on the proposed
<br />1977-78 annual budget.
<br />
<br /> NO~, THEREFORE, BE IT RESOLVED by the Council of the. City of Portsmouth, Virginia,
<br />that the location of the regular scheduled Council Meeting of May 10, 1977 be changed from
<br />the Council Chambers of the Municipal Building to T. A. Willett Auditorium at W~odrow Wilson
<br />High School fora public hearing on the proposed 1977-78 annual'budget, commencing at 7:30
<br />P. M., Eastern Daylight Time.,, ~
<br />
<br />A~es: Early, Elliott, Holley, Oast, Wentz, Davis
<br />Nays: None