Laserfiche WebLink
(11 For the construction of highways and anv draining. dredging excavation <br />grading or similar work upon real property: or <br />(21 At anv time that the city has a population in excess of 100 000 provided that the <br />city has the personnel.__procedures. and expertise to enter into a contract for <br />construction on a fixed price or not-to-exceed price design-build or construction <br />management basis and shall otherwise be in compliance with the provisions of <br />this article and other applicable law governing design-build or construction <br />management contracts for public bodies other than the Commonwealth The <br />procedure established by the city for fixed price or not-to-exceed price design- <br />build or construction management contracts must be consistent with the two- <br />step competitive negotiation process established under Code of Virginia & 2 2- <br />4302.2. as amended. restated or moved from time to time: or <br />(31 As otherwise provided in Code of Virginia. & 2.2-4308. as amended restated or <br />moved from time to time. <br />16. Anew section, designated Section 12-222, is added to the Code of the City of <br />Portsmouth, Virginia (2006) as follows: <br />Sec. 12-222. -Design-build or con truction management contracts: eligihiliw <br />reauirements: award of contract. <br />(al The city may enter into a contract on a fixed price or not-to-exceed price design- <br />build or construction management basis provided the city complies with the <br />reauirements of Code of Virginia. & 2.2-4308. as amended restated or moved from <br />time to time. and has implemented procedures consistent with the procedures <br />adopted by the Virginia Secretary of Administration for utilizing desim-build or <br />construction management contracts <br />(bl Prior to making a determination as to the use of design-build or construction <br />management for a specific construction proiect. the city shall have in its employ or <br />under contract a licensed architect or engineer with professional competence <br />appropriate to the proiect who shall advise the city regarding the use of design-build <br />or construction management for the proiect and who shall assist with the preparation <br />of the reauest for proposals and the evaluation of proposals <br />(cl Prior to issuing a reauest for proposals for any design-build or construction <br />management contract for a specific construction Proiect city council shall have <br />adopted. by ordinance_ _or resolution. written procedures governing the selection <br />evaluation and award of design-build and construction management contracts The <br />Procedures shall: <br />13 <br />