Laserfiche WebLink
<br />feet to a point; thence following the southern line of Tax <br />Parcels 0466-0530, 466-0531, 0465-0010, 0465-0050, <br />0465-0060, 0465-0070, 0465-0080, 0465-0101 and 0463- <br />0020, N 77005'04" E 146.58 feet to a point; N 68029'02" <br />E 26.05 feet to a point; N 88043' 19" E 364.57 feet to a <br />point; S 53056' 11" E 409.40' feet to the point of <br />beginning, all of which "is comprised of Tax Parcels 0461- <br />0080 and 0458-0010 and contains approximately 40.6 <br />acres, more or less. <br /> <br />3. That the June 28, 2011 rezoning was subject to conditions proffered by the <br />applicant and made a part of Ordinance 2011-44 <br /> <br />4. That the applicant has requested modifications of certain of said <br />conditions, and the Planning Commission has recommended approval of the applicant's <br />request. <br /> <br />5. That the subject property shall be subject to the following amended and <br />restated conditions as proffered by the applicant: <br /> <br />(a) The property will be rezoned to Urban Residential-Master-Planned <br />Overlay UR-MPO and shall be used solely for the construction of up to 200 market rate, <br />for sale, single-family detached dwelling units. <br /> <br />(b) The development shall be designed and constructed in substantial <br />compliance with the conceptual master plan prepared by Hoggard-Eure Associates, P.C. <br />dated December 21, 2012 and titled "Conceptual Neighborhood Plan for Afton Green, <br />Portsmouth, Virginia." <br /> <br />(c) All development on the property, including the open space, shall be in <br />substantial compliance with the minimum design standards as contained within the <br />Development Guidelines, titled, "Afton Green, Development Guidelines, April 25, 2011, <br />revised May 31, 2011, Revised December 21,2012, Cradock Properties, L.L.C." <br /> <br />(d) All improvements recommended and required as part of the Traffic Impact <br />Assessment dated November 30,2010, as approved by the City Engineer, whether on-site <br />or off-site, shall be designed and installed as part of the development at no cost to the <br />City. The improvements associated with the intersection of Afton Parkway and George <br />Washington Highway shall be constructed with the first phase of development. All other <br />improvements required by the Traffic Impact Assessment shall be constructed with the <br />second phase of development. <br /> <br />(e) All improvements and relocations recommended and required for the <br />provisions of public utilities, as outlined in the memorandum of understanding prepared <br />by Hoggard-Eure Associates dated April 11, 2011 and approved by the Department of <br />