My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003 Resolutions
Portsmouth-City-Attorney
>
RESOLUTIONS
>
2003
>
2003 Resolutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2009 3:35:14 PM
Creation date
5/15/2003 5:12:45 PM
Metadata
Fields
Template:
Ord/Resolutions
Year
2003
Ord/Resolutions - Type
Resolutions
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R-03-67 <br /> <br />A RESOLUTION AUTHORIZING A CONTRACT TO SPAN SYSTEMS, INC. FOR A <br />ROOF STRUCTURE FOR THE PERFORMING ARTS CENTER. AND FURTHER <br />AUTHORIZING THE ASSERTION OF LEGAL CLAIMS AND RIGHTS IN <br />CONNECTION WITH THE PRIOR ROOF STRUCTURE. <br /> <br /> WHEREAS. by Resolution No. R-03-63, the City Manager was authorized and directed <br />to recommend to City Council a proposed contractor for the repair of the roof structure for the <br />performing arts center commonly known as nTelos Pavilion at Harbor Center, with his <br />recommendation to be based on (a) price; (b) the ability to complete the work expediently; <br />(c) experience and qualifications; and (d) honesty and integrity; and <br /> <br /> WHEREAS, the City Manager has solicited and received bids from several qualified <br />contractors for this purpose and has thoroughly investigated and considered those bids; and <br /> <br /> WHEREAS, the City Manager has recommended that the contract be awarded to SPAN <br />SYSTEMS, INC., based on the above four criteria; <br /> <br />Now, therefore, BE IT RESOLVED by the Council of the City of Portsmouth, Virginia: <br /> <br />That the Director of Procurement and Risk Management is hereby authorized to issue to <br />SPAN SYSTEMS, INC. a "Notice of Intent to Award Contract" for redesign and <br />replacement of the performing arts center commonly known as nTelos Pavilion at Harbor <br />Center. <br /> <br />Said Director is hereby further authorized to negotiate and to execute a contract for said <br />purpose with SPAN SYSTEMS, INC., with the contract to be in an mount not to exceed <br />$1,261,000, covering design, construction, and a performance bond satisfactory in form <br />and substance to said Director and to the City Attorney. An additional $250,000 shall be <br />permitted for changes and contingencies. <br /> <br />3. The contract shall require completion by June 1, 2004. <br /> <br />The contract shall require the completed structure to be able to withstand winds of at least <br />100 miles per hour, and it shall contain design and/or performance standards and <br />warranties acceptable in form and substance to the City Engineer and the City Attorney. <br /> <br />The City Manager shall make timely reports to Council On the status of this contract and <br />the performance of the contractor. <br /> <br />The City Attorney is further authorized and directed to pursue all legal rights and claims <br />that may lie against the original provider of this roof structure, Birdair, Inc. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.