Laserfiche WebLink
~ (b) heavy landscaping along the Free~ay right-of-way <br />indicating plant material.appropriate as a noise barrier or <br />a final-site plan review provision of alternate barrier as <br />specified by the Department of Engineering & Technical Services. <br /> <br /> 2. The location of buildings in the southern and <br /> northern portion must be adjusted to meet the setback require- <br /> ments. <br /> <br /> 3. A turn-around space must be provided to b~ approved <br />by the Traffic Engineering and Public Utilities Department on <br />the final engineering plans prior to issuance of any building <br />permit. <br /> <br /> Adopted by the Councl of the City of Portsmouth~ Virginia <br />at a meeting held January 24, 1984. <br /> <br />Teste: <br /> <br />City Clerk <br /> <br /> <br />