My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1988 Ordinances
Portsmouth-City-Attorney
>
ORDINANCES
>
1988
>
1988 Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2009 3:41:44 PM
Creation date
6/19/2001 5:37:30 PM
Metadata
Fields
Template:
Ord/Resolutions
Year
1988
Ord/Resolutions - Type
Ordinances
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
274
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
said plat for final approval. <br /> <br />SECTION 3S-54 [RESERVED] <br /> <br />33-55 FINAL PLAT APPROVAL <br /> <br />(a) <br /> <br />The subdivider shall, within one year after <br />preliminary plat approval by the Planning Commis- <br />sion, apply in writing for approval of the final <br />subdivision plat and submit for file five (5) pap~2~ <br />copies of the plat and one reproducible tracing of <br />the plat; and he shall submit a fee with the <br />application as required by Article V of this <br />Chapzer. <br /> <br />The final subdivision plat shall be submitted in <br />accordance with Article IV of this Chapter. <br /> <br />Approval of the final devetopmen~ subdivision plat <br />shall be evidenced within thirty (30) days on the <br />face thereof by the signazures of the Planning <br />Director (or the Principal Planner) and the City <br />Engineer (or Assistant City Engineer). Such <br />approval shall not be given until a bond or other <br />security is posted and an agreement filed in <br />accordance with Section 33--32 of this Chapter. <br /> <br />(d) <br /> <br />The subdivider may file for final approval of a <br />portion of the approved preliminary subdivision <br />plat which he proposed to record. <br /> <br />Any substantial change in the proposed final <br />subdivision plat from the approved preliminary plat <br />shstl constitute grounds for referral of the plat <br />by the Planning Director to the Planning Commission <br />at its nex~ regular meeting. <br /> <br />(f) <br /> <br />At each regular Commission meeting the Planning <br />Director shall repor~ on the approval of final <br />development subdivision plats. <br /> <br />It shall be unlmwful for anyone ~o alter a final <br />subdivision plat after the Planning Director and <br />the City Engineer have affixed their signazure~ <br />thereto, without their permission in writing, and a <br />plat so altered withou~ written permission shall be <br /> <br />PORTSMOUTH SUBDIVISION ORDINANCE -- PAGE 25 <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.