Laserfiche WebLink
engineer or ninety (90) days following Grantee's notice to <br />the City, whichever occurs first. <br /> <br /> 7.02 Construction Standards. <br /> <br /> A. Ail construction practices shall be in accordance <br />with all applicable sections of the Occupational Safety and <br />Health Administration as well as all state and local codes <br />where applicable. <br /> <br /> B. Ail installation of electronic equipment shall be <br /> of a permanent nature, durable and installed in accordance <br /> with the provisions of the National Electrical Safety Code <br /> (National Bureau of Standards) and National Electrical Code <br /> (National Bureau of Fire Underwriters) as amended. <br /> <br /> C. Antenna supporting structures (towers) shall be <br /> designed for the proper loading as specified in the <br /> Electronics Industry Association,s R.S 3-22A <br /> Specifications. <br /> <br /> D. Antenna supporting structures (towers) shall be <br /> painted, lighted, erected and maintained in accordance with <br /> all applicable rules and regulations of the Federal <br /> Aviation Administration and all other applicable state or <br /> local codes and regulations. <br /> <br /> E. All of Grantee's plant and equipment, including <br />but not limited to the antenna site, headend and <br />distribution system, towers, house connections, structures, <br />poles, wire, cable, coaxial cable, fixtures and <br />appurtenances shall be installed, located, erected, <br /> <br />-14- <br /> <br /> <br />