My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1990 Ordinances
Portsmouth-City-Attorney
>
ORDINANCES
>
1990
>
1990 Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2009 3:41:17 PM
Creation date
6/18/2001 5:35:00 PM
Metadata
Fields
Template:
Ord/Resolutions
Year
1990
Ord/Resolutions - Type
Ordinances
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
276
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Includes calculations and <br />anticipated drainfield or <br />irrigation areas; <br /> <br />locations of <br /> wastewater <br /> <br />ii. <br /> <br />Provides justification for sewer line <br />locations in environmentally-sensitive areas, <br />where applicable, and describes construction <br />techniques and standards; <br /> <br />iii. <br /> <br />Discusses any proposed on-site collection and <br />treatment systems, their treatment levels, <br />and impacts on receiving watercourses. <br /> <br />iv. <br /> <br />Describes the potential impacts of the <br />proposed wastewater systems on water quality <br />and lands within CBPA's, including the <br />proposed mitigative measures for these <br />impacts. <br /> <br />(e) <br /> <br />Identification of the existing characteristics and <br />conditions of sensitive lands included as <br />components of Chesapeake Bay Preservation Areas, <br />as defined in this Chapter. <br /> <br />(f) <br /> <br />As part of any major water quality impact <br />assessment submittal, the City Engineer may <br />require review by the Chesapeake Bay Local <br />Assistance Department (CBLAD). Upon receipt of a <br />major water quality impact assessment, the City <br />Engineer will determine if such review is <br />warranted and may request CBLAD to review the <br />assessment and respond with written comments. Any <br />comments by CBLAD will be incorporated into the <br />final review by'the City Engineer, provided that <br />such comments are provided by CBLAD within 90 days <br />of the request. <br /> <br />(5) Evaluation Procedure. <br /> <br />(a) <br /> <br />Upon the completed review of a minor water quality <br />impact assessment, the City Engineer will <br />determine if any proposed modification or <br />reduction to the buffer area is consistent with <br />the provisions of this Chapter and that the <br />following criteria have been satisfied: <br /> <br />i. The proposed encroachment is necessary due to <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.