Laserfiche WebLink
following <br /> <br />UP-95-08 <br /> <br /> Beginning at the northeastern <br />intersection of Ballard Street and Adamson <br />Street; thence east along the southern <br />right-of-way line of Ballard Street <br />approximately 2080± feet to a point; thence <br />southwest 330± feet to a point; thence <br />southeast 125± feet to a point; thence <br />southwest 80± feet to a point; thence <br />southwest !75± feet to a point; thence west <br />125± feet to a point; thence southwest 250± <br />feet to Elmhurst Lane; thence west along <br />the northern right-of-way line of Elmhurst <br />Lane approximately 1585± feet to a point; <br />thence northwest 26 feet to a point; thence <br />northeast 29 feet to a point; thence north <br />80 feet to end of Adamson Street; thence <br />east 20 feet to a point; thence north along <br />the eastern right-of-way line of Adamson <br />Street to the point of beginning. <br /> <br />That this use permit is approved subject to the <br />conditions: <br /> <br />(a) <br /> <br />The site layout and landscaping shall be <br />installed and maintained in accordance with <br />Exhibit A, attached hereto and made a part <br />hereof. The building(s) shall be constructed in <br />accordance with the Alternative I elevations, <br />identified as Exhibit B, attached hereto and <br />made a part hereof. Minor modifications may be <br />approved by the Planning Director prior to the <br />issuance of building permits. <br /> <br />(b) <br /> <br />The use permit shall be for the first phase of <br />the project only. An additional use permit <br />shall be required for the expansion of the <br />physical plant, except parking areas. <br /> <br />(c) <br /> <br />A combination of shrubs, evergreen medium and <br />large trees, such as Austrian Pine, Live Oak, <br />Loblolly Pine and Magnolia, shall be planted <br /> <br /> <br />