Laserfiche WebLink
August 28, 1984 <br /> <br /> Motion of Mrs. Webb and seconded by Mr. Gray, that the matter be referred to the Planning <br />Commission for a public hearing, and was adopted by unanimous vote. <br /> <br /> Motion of Mr. Whitlow and seconded by Mr. Beamer, that the City Manager be authorized <br />to proceed with the procurement process of selecting an architect, and was adopted by unanimou~ <br />vote. <br /> <br />REPORTS FROM THE CITY MANAGER <br /> <br /> 84-301 Letter from the City Manager recommending adoption of an ordinance to appropriat <br />$200,000 for a space utilization study and design for Parks and Recreation maintenance facilit <br /> <br /> 'The 1983/84 Capital Improvement Program authorized $100,000 for a study <br />for office space utilization and of future development of the City Compound. <br />included $110,000 for design of a new park maintenance facility. <br /> <br />of City needs <br />The CIP also <br /> <br /> There are approximately 100 buildings that are currently maintained by the General <br />Services Department. Many of the structures are in need of major repairs and alterations to <br />continue their use as public buildings. With the costs for the renovations estimated to be - <br />several million dollars, it was decided to evaluate the necessity for retaining all of the <br />buildings and if consolidation of some operations could reduce the overall space requirements. <br />This study will-also analyze various alternative configurations for the City Ooerations Center <br />on Frederick Boulevard. A reorganization of the facility ~s necessary to provide a more ef- <br />ficient and secure operation, particularly with the abandonment of the incinerator and the <br />possible relocation of the park maintenance headquarters to the Frederick Boulevard site. <br /> <br /> The third element of the consultant's work would be to design the park maintenance head- <br />quarters after the final location has been determined. <br /> <br /> I recommend that City Council appropriate $100,000 for a space utilization study and <br />$100,000 for design of a new park maintenance facility for a total appropriation of $200..000." <br /> <br /> On motion of Mr. Gray and seconded by Mrs. Webb, the following ordinance was approved <br />on first reading, and was adopted by unanimous vote: <br /> <br />"AN ORDINANCE TO APPROPRIATE $200,000 FROM THE CAPITAL IMPROVEMENT FUND FOR A <br />SPACE UTILIZATION STUDY OF THE CITY MAINTENANCE FACILITY AND THE DESIGN OF A <br />PARK MAINTENANCE FACILITY.' <br /> <br /> 84-302 Letter from the City Manager recommending adoption of an ordinance to appropri- <br />ate $165,226 and award of low bid for Phase I of Civic Center Plaza repairs. <br /> <br /> "The current Capital Improvement Program identifies $710,000 for repairing leakage and <br />deterioration of the Civic Center Plaza. To date, $60,000 has been a~.~opriated to attempt <br />remedial waterproofing efforts and to hire a professional engineering firm to make recommen- <br />dations and develop specifications for bid. The engineer's report has been received and it wa <br />the recommendation of the City Engineer to phase the work to gain a better understanding of <br />the City struction nroblems before the entire deck is replaced. ~n essence, this phase will <br />serve as a test to ~o~]~ out any problems prior to entering into a contract for the entire Civic <br />Center .Plaza. The first phase would consist of replacing the plaza deck and construction of ~ <br /> <br />necessary waterproofing measures in <br /> <br />the area to the north and east of the jail. <br /> <br /> Bids for this phase of the work were received on July 25, 1984, and they are tabulated <br />as follows: <br /> <br />~\~OUN~ OF BID % OF BID <br /> <br />City Estimate $112,000 100~ <br />Western Waterproofing Co., Inc. 90,226 80~ <br />Crowder Contracting Co., Inc. 130,700 116% <br />Century Concrete Services 144,345 129% <br />Conrad B~others 149,900 134% <br />Challenge Constructors 153,600 137% <br /> <br /> The City Engineer has investigated Western Waterproofing Company, Inc. with regard <br />to both qualifications to perform the work and financial status and he recommends award of <br />the contract to the apparent low bidder. Contingencies, consultant services, contract ad- <br />ministration and inspection and testing laboratory services bring the total anticipated projec~ <br />cost to $165,226. <br /> <br />The total project cost is calcuIated as follows: <br /> <br />Contract Price $ 90,226 <br />Contingencies 30,000 <br />Consultant Services (lst & following phase) 29,000 <br />Contract Administration ~ Inspection 15,000 <br />resting Laboratory Services 2,000 <br />Total Anticipated Project Cost $165,226 <br /> <br /> I reco~mnend that the attached ordinance appropriating $165,225 be approved on first <br />reading and that the contract be awarded to Western Waterproofing Company, Inc. The time <br />for completion of this phase is 90 days. To replace the entire deck is anticipated to take <br />approximately 18 months." <br /> <br /> <br />