Laserfiche WebLink
Summar~ <br /> <br />Class Room Section <br />Auditorium and Cafeteria Section <br />Remodeling Eeating Plant <br /> <br />in~ur~uce Collected <br /> <br />$ 125,006.28 <br /> 164,002.75 <br /> <br />323,004°05 <br />144,95i.20. <br /> <br />~ 1V8,05~.83 <br /> <br />STAT~NT 0F COST 0~ REPAIRS <br /> <br />Heating <br />Plumbing <br />Tile and Terrazzo <br />Steel <br />Marquise <br />Plineths <br />Doors - Library ~nd Band Room <br />Hardware-and Window Co~ds <br />Plaster <br />Painting <br /> <br />Electric Work <br />Clocks - New <br />Labor <br /> <br />Work to be completed <br /> <br />CAU, <br /> <br />FIRE <br /> <br /> 1,690.00 <br /> 5,269.00 <br /> 1,659.00 <br /> 2,328.00 <br /> 330.00 <br /> 221,00 <br /> B36.00 <br /> 350.00 <br /> 2~389o00 <br /> 3,000.00 <br /> !,V~0.00 <br /> 500.00 <br /> 2,!00.00 <br /> 7,000.Qq <br /> <br />28,792.00 <br />1,045,00 <br /> <br />$ <br /> <br />On motion ordered filed. <br /> <br /> 4th - "I mu submittim~ an estimate of the cost of three d~ains in <br />the City, which ~s inl~rtheran~ce-of the request of Councilmen Howard, warren a nd Weiseman. <br /> if the Council de&ides to construct the~e d~ains, you must <br />enter into the records authority t~ issue bonds at the end of the yea~, to cover their cost." <br /> <br />Inclosure - <br /> "In compliance with your request~ of February 13th, 1947, we <br />a~e herewith submitting estimate of cost fb~ installation of storm ~[v~ns at the <br />following locations: <br /> <br />1 - Hartford St.-Dou~!as Avenue-Woodrow St..~F~o~ida Ave. ~-.Washin~ton Wa~d <br /> <br />450 lin. ft. 18" pipe with appurtenances ~ 1~,250.00 <br />200 " " 12~ " <br /> <br />Second St. Randolph St.~ ~adisiqn ~d <br /> <br />400 lin. ft. 36~ pipe with app~tenances <br /> <br />6,000.00 <br /> <br />Race St. - Elm Ave.,Prentis Ave..-Map~e ~v~o_- <br />'G~nder C~eek - Lee Wa~d <br /> <br />Race St. and Elm Ave. t o East of Maple Ave. at the <br />h~ad oF Gander-Creeko V20 lin. ft. 36" Cone.. d~ain <br />with a~pu~tenances <br /> <br />Yours truly, <br /> <br /> il0,800~00 <br />$ 31,050.00 <br /> <br />F.J. Berge~on, City,Engineer." <br /> <br /> Motion of ~. Hovm_vd to place an appropriation of~'.,~50,00 on its <br />first . ead~ug, was adopted. <br /> <br /> to the <br /> 5th - ~he V~rg~n~a ~lect~ie and Power Company presented <br />Czty, on Febru~a~y 24th, 194~, a new eontrac~ for lzght_ .~nd power and I sm advzszng you of the <br />receiptsmme." of this_ co~tract, with no recommendation, as I t~ave not had a chance to make a study of <br /> <br /> On motion ordered filed. <br /> <br /> 6th - "0~ February 19th, the City Engineer and I had a Coherence <br />with officials 6f the State Highway Depar~ent with reference to funds available to the City of <br />Portsmouth for highway and street const~ction. <br /> There will be available to the ~City of Port~aouth <br />$464,000.00, of.which we would be r~quired te share one fourth, or $116,000.00 For any improve- <br />ments made on Federal highways within the City o f Fortsmouth. <br />The following highways listed are thc~e which will be <br />el.igible for this f~_nd. However, we must have new construction, widening of highways~ under- <br /> <br /> <br />