My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Minutes 03/31/1998
Portsmouth-City-Clerk
>
Minutes
>
1990s
>
Year 1998
>
Minutes 03/31/1998
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/30/2001 8:01:44 PM
Creation date
7/30/2001 7:59:43 PM
Metadata
Fields
Template:
City Council
City Council - Type
Adopted Minutes
City Council - Date
3/31/1998
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
March 3t.1998 <br /> <br />"WHAT IS PAST iS BACKLOG" <br /> <br />During the difficult financial periods, as a result of the struggle to meet the <br />most basic needs of our citizens, investments to reduce costs in the future <br />were not made, and have created a backlog of needs. To paraphrase William <br />Shakespeare: "What is past is backlog." A few simple examples will illustrate <br />this backlog. <br /> <br />The average age of the City's vehicle fleet is 12 years. The national average <br />for a municipal fleet is 8 years. The estimated cost to bring our fleet up to <br />the national average age is $7.5 million. <br /> <br />The City maintains 1.5 million square feet of building space (not including <br />schools). An estimated $16 million dollars is needed for the repair and <br />replacement of roofs and removal of asbestos. <br /> <br />The Public Works Department maintains 872 lane miles of street. At the <br />current level of expenditures for repaving and reconstructing, the average <br />cycle of repair is every 51 years. The average life of a street is actually, 20 <br />years. <br /> <br />· Salary increases for city employees have averaged 2% over the last 3 years <br /> and is below the average increases in the Hampton Roads cities. <br /> <br />While the cost of routine and scheduled replacement and investment in <br />preventive maintenance are more expensive in the short-term, the cumulative <br />effects of this lack of funding increases the cost of maintenance on an annual <br />basis and costs more in the long-term. As the City's financial condition <br />improves, the backlog of needs must be addressed and poses particular <br />budget challenges in aligning expenditures with our priorities. <br /> <br />EXPENDITURES <br /> <br />Prior to balancing this budget, I established basic priorities and guidi~ng <br />principles. The priorities were to: <br /> <br />· Meet existing obligations and commitments, <br />· Provide an increase in school funding, <br />· Provide a salary increase for City employees, <br />· Begin addressing the backlog of equipment needs, <br /> <br />And most importantly, to continue to provide the basic services expected iby <br />our citizens. <br /> <br />The budget posed a significant challenge in that before any department <br />requests above the 1998 level of funding could be honored, $2.9 million in <br />obligations and commitments must be covered by the projected increase ~ in <br />general fund revenues of $4.6 million. These commitments included full <br />funding for the Hampton Roads Regional Jail, debt service on bonds issued!in <br />1997 and increased operational costs for the Children's Museum of Virginia. <br /> <br />In this budget recommendation, we must spend responsibly within the <br />available, limited resources, as each of us must do in our own personal <br />spending. In this presentation, a few initiatives will be highlighted that are <br />included within this budget recommendation. <br /> <br />The total city budget equals $294 million, with the schools representing 42% iof <br />the total budget and the City's general fund at 31% of the consolidated budget. <br />Of the City's general fund budget, 25% is a transfer to schools and 21% <br />dedicated to public safety. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.