Laserfiche WebLink
The RCR 288 ct fiber will splice into <br />The 864ct will then <br />From the NEMA enclosure, the <br />the 864ct fiber before transitioning <br />travel through the <br />fiber will travel through the <br />to the Western Frwy Bridge, This <br />existing riser which is <br />existing Moxcell innerduct <br />will be done in the RCR Hand Hole. <br />attached to the <br />made available by <br />The 864ct will traverse from the <br />abutment, into the <br />Portsmouth. The fiber will use <br />RCR Hand Hole to a Portsmouth <br />NEMA enclosure that <br />this Moxcell sleeve to make its <br />Hand Hole to access the bridges <br />is installed near the <br />way through the entirety of <br />exisiting conduit. <br />deck of bridge <br />the bridge conduit. <br />Note* All bridge conduit, risers, junction boxes, and attachments are existing property of Portsmouth <br />