My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2019 Ordinances
Portsmouth-City-Attorney
>
ORDINANCES
>
2019
>
2019
>
2019 Ordinances
>
2019 Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/13/2019 9:07:10 AM
Creation date
1/10/2019 4:16:58 PM
Metadata
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
230
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
180.65 feet along the eastern right of way line of Effingham Street <br />to a point; thence N 87 degrees 03' 03" E — 180.00 feet along the <br />southern right of way line of Firehouse Lane (formerly Glasgow <br />Street) to a point; thence S 3 degrees 26'35 "E - 181.76 feet along <br />the property line of Parcel 3, to a point; thence N 78 degrees <br />07'41" W — 5.60 feet along the northern right of way line of <br />London Street to a point; thence continuing along said right of way <br />line S 86 degrees 56'39" W — 174.60 feet to the point of beginning. <br />IT BEING all that certain property conveyed to 720 London, Inc. <br />by Deed of Bargain and Sale from Bank of the Commonwealth <br />dated June 5, 2009 and recorded as Instrument Number 090006463 <br />in the Portsmouth Circuit Court Clerk's Office. <br />3. That the subject property shall be subject to the following conditions as <br />proffered by the applicant for rezoning and owner of the property: <br />(a) When redeveloped, the Property shall be developed in substantial <br />conformity with the conceptual layout prepared by Bohler <br />Engineering, entitled "Governance Plan for Wawa ", and dated <br />January 9, 2019, except for modification required by the City's <br />Codes and Ordinances during the Subdivision and Site Plan <br />Review process. <br />(b) When constructed, the primary structure located on the Property <br />shall be developed in substantial conformity with the conceptual <br />elevations prepared by Cuhaci & Peterson, entitled "Wawa W50 <br />FB VA— v.2018.01 — Store #8672 ", and dated January 2, 2019, <br />except for modification required by the City's Codes and <br />Ordinances during the Site Plan Review process. <br />(c) When constructed, the gasoline canopy and dumpster enclosure <br />located on the Property shall be developed in substantial <br />conformity with the conceptual elevations prepared by Cuhaci & <br />Peterson, entitled "Wawa Gas Canopy Stacked 6 — A Frame — <br />Trash Compound MASQ17 -R — Store #8672 ", and dated January <br />2, 2019, except for modification required by the City's Codes and <br />Ordinances during the Site Plan Review process. <br />4. That this ordinance shall take effect on the date of its adoption. <br />ADOPTED by the Council of the City of Portsmouth, Virginia, at a meeting held <br />on March 26, 2019. <br />Teste: <br />City Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.