My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018 Resolutions
Portsmouth-City-Attorney
>
RESOLUTIONS
>
2018
>
2018 Resolutions
>
2018 Resolutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 12:05:28 PM
Creation date
1/9/2018 10:57:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
3. That the use permit is approved subject to the following conditions which <br />shall be observed by the applicant and any successor in interest: <br />(a) The proposed development shall be in substantial compliance with the <br />plans prepared by B C Architects Engineers with an Engineer's seal dated <br />April 12, 2018 and submitted by the applicant, except where modifications <br />may be required to comply with the City's Ordinance requirements. <br />(b) The height of the monopole communications tower shall not exceed 150 <br />feet in height measured from the ground surface immediately adjacent to <br />the tower. <br />(c) A Type B bufferyard as set forth in Section 40.1- 5.2(E) of the Portsmouth <br />City Code shall be provided around the tower's equipment compound, <br />except at the gate which must be screened in a manner acceptable to the <br />Director of Planning. In addition, any generator located on site must be <br />equipped with a sound reduction cover to mitigate any noise impacts on <br />nearby residences. <br />(d) The storage of tires on the property outside of an approved storage yard or <br />a single enclosed trailer shall be prohibited. <br />(e) The applicant must obtain and keep current any required operating <br />licenses, approvals and permits and shall operate in accordance with all <br />federal, state and local regulations. <br />(f) All taxes /fees associated with the property and /or the proposed use shall <br />be paid when due. <br />4. REVOCATION OF PERMIT: Violation of any of the above conditions <br />may serve as grounds for revocation of the use permit by City Council. <br />ADOPTED by the Council of the City of Portsmouth, Virginia, at a meeting held <br />on July 24, 2018. <br />Teste: <br />City Clerk <br />
The URL can be used to link to this page
Your browser does not support the video tag.