My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2018 Resolutions
Portsmouth-City-Attorney
>
RESOLUTIONS
>
2018
>
2018 Resolutions
>
2018 Resolutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/18/2018 12:05:28 PM
Creation date
1/9/2018 10:57:43 AM
Metadata
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
R -18 -31 <br />A RESOLUTION AUTHORIZING THE CITY MANAGER TO APPROVE <br />CHANGE ORDERS TOTALING MORE THAN 25% OF THE CONSTRUCTION <br />CONTRACT WITH GASTON BROTHERS UTILITIES, LLC FOR THE HIGH <br />STREET SEWER RELOCATION PROJECT. <br />WHEREAS, rapid deterioration of aged sewer system pipes at the intersection of <br />High Street and Shenandoah Street affected the flow of wastewater in the area, <br />necessitating the use of temporary pumps and bypass pipelines that caused excessive noise <br />and exhaust fumes and the re- routing of traffic patterns; and <br />WHEREAS, the deterioration of the pipes created the risk of sanitary sewer <br />overflows and leakages, which would have threatened the welfare of citizens and placed <br />the City in jeopardy of violating the Special Order by Consent between the local <br />governments of Hampton Roads and the Virginia Department of Environmental Quality; <br />and <br />WHEREAS, to resolve these issues as quickly as possible an Invitation to Bid for <br />the repair and replacement of the sewer pipes was issued on an expedited basis with bid <br />specifications based on the best estimates of the City and its contracted engineering firm <br />(WSP) regarding the condition and location of the utility lines in the area and the scope of <br />the needed repairs; and <br />WHEREAS, the low bid was submitted by Gaston Brothers Utilities, LLC in the <br />amount of $685,110.70; and <br />WHEREAS, four additional bids were submitted for the project in amounts <br />ranging from $844,232 to $1,748,590; and <br />WHEREAS, the contract was duly awarded to Gaston Brothers Utilities, LLC; and <br />WHEREAS, after award of the contract it was discovered that certain existing <br />underground utility lines were either not shown or shown incorrectly on the existing <br />records; and <br />WHEREAS, it is therefore necessary to modify various aspects of the contractual <br />scope of work, including adding the replacement of an aged 8 -inch water line and <br />associated water facilities; and <br />WHEREAS, the work is being performed in the area adjacent to the Churchland <br />Bridge and has therefore required more extensive and complex traffic controls than <br />originally anticipated; and <br />WHEREAS, the resulting changes to the project scope will increase the project <br />cost by an additional $244,476.57, or 36% of the original contract price; and <br />WHEREAS, Section 12 -183 of the City Code requires Council approval to exceed <br />an original contract amount by more than 25% or $50,000, whichever is greater; and <br />WHEREAS, it is projected that the final project cost will be $929,587.27; and <br />
The URL can be used to link to this page
Your browser does not support the video tag.