Laserfiche WebLink
Portsmouth, Virginia, Code of Ordinances: PART II -CODE -Chapter 94.1 FLOOD PROTECTION <br />(4} Review applications to determine whether all necessary permits have been obtained from the <br />Federal, Sta#e, or local agencies from which prior or concurrent approval is required; in particular, <br />permits from state agencies for any construction, repair, or any alteration of a dam, reservoir, or <br />waterway obstruction {including bridges, culverts, structures), any alteration of a watercourse, or <br />any change of the course, current, or cross section of a stream or body of water, including any <br />change to the i00-year frequency floodplain offree-flowing non-tidal waters of the State. <br />(5} Verify that applicants proposing an alteration of a watercourse have notified adjacent <br />communities, the Department of Conservation and Recreation (Division of Dam Safety and <br />Flvodpiain Management], and other appropriate agencies (VADEQ, VIMS, VMRC, USACE) and <br />have submitted copies of such notifications to FEMA. <br />{6} Advise applicants for new construction or substantial improvement of structures that are located <br />within an area of the Coastal Barrier Resources System established by the Coastal Barrier <br />Resources Act that Federal flood insurance is not available on such structures; areas subject to <br />this limitation are shown on FIRMS as Coastal Barrier Resource System Areas (CBRS} or <br />O#herwise Protected Areas (OPA}, <br />(7) Approve applications and issue permits to develop in flood hazard areas if the provisions of this <br />chapter have been met, or disapprove applications if the provisions of this chapter have not been <br />met. <br />(8) Inspect or cause to be inspected, buildings, structures, and other development for which permits <br />have been issued to determine compliance with these regulations or to determine if non- <br />compliance has occurred or violations have been committed. <br />(9} Review Elevation Certificates and require incomplete or deficient certificates to be corrected. <br />(10}Submit to FEMA, or require applicants to submit to FEMA, data and information necessary to <br />maintain FIRMS, including hydrologic and hydraulic engineering analyses prepared by or for the <br />City, within six months after such data and information becomes available if the analyses indicate <br />changes in base flood elevations. <br />(11 }Maintain and permanently keep records that are necessary for the administration of these <br />regulations, including: <br />a. Flood Insurance Studies, Flood Insurance Rate Maps {including historic studies and maps <br />and current effective studies and maps} and Letters of Map Change; and <br />b. Documentation supporting issuance and denial of permits, Elevation Certificates, <br />documentation of the elevation (in relation to the datum on the FIRM} to which structures <br />have been flood-proofed, other required design certifications, variances, and records of <br />enforcement actions taken to correct violations of these regulations. <br />(12}Enforce the provisions of these regulations, investigate violations, issue notices of violations or <br />stop work orders, and require permit holders to take corrective action. <br />23 <br />