My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2015 Resolutions
Portsmouth-City-Attorney
>
RESOLUTIONS
>
2015
>
2015 Resolutions
>
2015 Resolutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/10/2015 3:50:13 PM
Creation date
1/21/2015 10:45:24 AM
Metadata
Fields
Template:
Ord/Resolutions
Year
2015
Ord/Resolutions - Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(c) The aggregate crushing equipment shall be limited to one Eagle Crusher <br />1200-25CC on the site at any given time. Replacement equipment -shall <br />meet the same specifications of the Eagle Crusher 1200-25CC in terms of <br />size, maximum capacity, noise and vibration, as determined by the <br />Planning Director. <br />(d) The applicant/operator shall be limited to one (1) self-contained and <br />totally enclosed cement mixer on the site at any given time, which will be <br />located in a shell building. No other batch plants will be permitted <br />elsewhere on the site. Additionally, the applicant/operator shall operate <br />the cement production facility and crushing equipment in full compliance <br />with the Air Permit issued by the Virginia Department of Environmental <br />Quality (DEQ). <br />(e) Dust control measures shall be fully documented as a part of the site plan <br />review process and -shall be implemented and maintained on the bulk <br />aggregate pile. <br />(f) A Buffer Yard shall be planted along the southern boundary of the site, as <br />generally shown on the concept plan titled Portsmouth Terminal Facility <br />dated January 20, 2015. This Buffer Yard shall be designed in accordance <br />with a Type B Buffer as described in more detail in Section 40.1-5.2(E) of <br />the Zoning Ordinance, except that the shrubs listed therein shall not be <br />required. <br />(g) The use of materials or any operation of any inherently explosive nature <br />on the site in connection with the aggregate and Redi-Mix production <br />operations shall be prohibited. <br />(h) The operation of video equipment on the overall site to monitor access and <br />operations of the port facility maybe allowed, but at no time shall this or <br />any other equipment depict or record any aspect of the property, <br />operations, or personnel at the Norfolk Naval Shipyard. <br />(i) The applicant shall obtain and keep current any required operating <br />licenses, approvals and permits and shall operate in accordance with all <br />federal, state and local regulations. <br />(j) All taxes/fees associated with the property and/or the proposed use shall <br />be paid when due. <br />4. REVOCATION OF PERMIT: Violation of any of the above conditions <br />may serve as grounds for revocation of the use permit by City Council. <br />
The URL can be used to link to this page
Your browser does not support the video tag.