My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
Ordinances 2014
Portsmouth-City-Attorney
>
ORDINANCES
>
2014
>
2014 Ordinances
>
Ordinances 2014
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/7/2015 2:43:34 PM
Creation date
2/18/2014 2:52:24 PM
Metadata
Fields
Template:
Ord/Resolutions
Year
2014
Ord/Resolutions - Type
Ordinances
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
162
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
stormwater runoff. The minimum monthly charge shall be equal to one ERU. The number of <br />ERU's will be determined by the Administrator of public works or his designee. <br />(b) All payments for this service shall be the responsibility of the owner. <br />(c) When new properties are brought into the utility system, fees will accrue commencing <br />with either completion of a frame or slab inspection or upon completion of any construction <br />which contributes impervious surface area where no certificate is issued or required for such <br />construction. <br />(d) In the event of alteration or addition to a nonresidential property which alters the <br />amount of impervious surface area, the stormwater management fees will be adjusted upon either <br />the completion of a frame or slab inspection or upon completion of the construction, whichever <br />occurs first, and the adjustment will be reflected in the next billing cycle. <br />(e) Nonresidential parcels having a total impervious surface area greater than 250,000 <br />square feet shall be assessed on the same basis as parcels of 250,000 square feet, for an interim <br />period which is authorized for up to five years, which period shall expire no later than June 30, <br />2000, for the purpose of investigating and evaluating the drainage runoff patterns and possible <br />use of regional best management practices (BMPs). <br />(f) Petitions for adjustments to the stormwater fees for residential and nonresidential <br />properties shall be submitted to the city manager or his designee, who shall be given the <br />authority to administer the procedures and standards and review criteria for the adjustment of <br />fees as established herein. Any petition submitted for adjustment to the stormwater fees for a <br />residential or nonresidential property shall be accompanied with a site plan or other such similar <br />scaled drawing. A petition shall also include calculations of the property's impervious and semi- <br />pervious area. The site plan and the calculations shall both be prepared by a professional <br />engineer or land surveyor licensed in the commonwealth and acceptable in format and content to <br />the Administrator of public works or his designee. <br />Sec. 31.2-27. Late charges. <br />In the event charges are not paid when due, interest thereon shall at that time accrue, at <br />the annual rate often percent, until such time as the overdue payment and interest is paid. <br />Charges and interests may be recovered by action at law or suit in equity and shall constitute a <br />lien against the property, ranking on a parity with liens for unpaid taxes. <br />
The URL can be used to link to this page
Your browser does not support the video tag.