Laserfiche WebLink
<br />drug store with drive-through facility at 3555 Airline Boulevard, Portsmouth, Virginia and being <br />more particularly described as: <br /> <br />UP-ll-Ol <br /> <br />3555 Airline Boulevard <br /> <br />PARCEL A <br />Beginning at a point marked P.O.B., said point being the intersection of <br />the south line of Airline Boulevard and the east line of Greenwood Drive; <br />thence along the south line of Airline Boulevard N 670 59' 33" E 200.00' <br />to a point; thence leaving the south line of Airline Boulevard S 22'000' <br />27" E 188.35' to a point; thence S 67059' 33" W 132.73' to a point on the <br />East line of Greenwood Drive; thence along the east line of Greenwood <br />Drive N 41039' 40" W 200.00' to the point of beginning, marked P.O.B. <br />and containing 0.719 acres (31,335 sq. ft.). <br /> <br />PARCEL B <br />Beginning at a point marked P.O.B., said point being the intersection of <br />the south line of Airline Boulevard and the east line of Greenwood Drive; <br />thence along the South line of Airline Boulevard N 670 59' 33" E 200.00' <br />to the true point of beginning; thence continuing along the South line of <br />Airline Boulevard N 670 59' 33" E 130.95' to a point; thence N 680 37' <br />01" E 116.36' to a point; thence leaving the south line of Airline <br />Boulevard S 33002'10" E 246.15' to a point; thence S 56057' 50" W <br />388.30' to a point on the east line of Greenwood Drive; thence along the <br />east line of Greenwood Drive N 410 39' 40" W 136.77' to a point; thence <br />leaving the East line of Greenwood Drive N 670 59' 33" E 132.73' to a <br />point; thence N 220 00' 27" W 188.35' to the true point of beginning and <br />containing 2.009 acres (87,524 Sq. Ft.). <br /> <br />3. That the use permit is approved subject to the following conditions which shall be <br />observed by the applicants and any successor in interest: <br /> <br />(a) The site shall be developed in substantial compliance with the site plan <br />submitted by Kimley-Hom dated March 18,2011. <br /> <br />(b) The building shall be developed in conformance with the submitted <br />elevation dated March 18, 2011. <br /> <br />(c) The recommendations of the Traffic Impact Analysis created October <br />2010 must be installed at the developer's expense. <br /> <br />(d) All uses on the property shall be operated in compliance with all <br />applicable codes, ordinances, and regulations of federal, state, and local <br />governments. <br />