My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2008 Resolutions
Portsmouth-City-Attorney
>
RESOLUTIONS
>
2008
>
2008 Resolutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/23/2008 11:13:17 AM
Creation date
4/15/2008 8:23:35 AM
Metadata
Fields
Template:
General
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
127
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
<br />(d) The tower shall be constructed with flush mount antennas as indicated in <br />the submitted plan. <br /> <br />(e) The tower shall be developed to accommodate the applicant and at least <br />three additional users. <br /> <br />(f) The proposed communications tower compound shall be enclosed with <br />wooden board-on-board fencing that is a minimum of eight feet in height. <br /> <br />(g) The applicant shall plant a minimum of nine new wax myrtle shrubs along <br />the eastern and southern border of the proposed fencing. <br /> <br />(h) The propane tank in the tower compound shall adhere to the Fire <br />Marshall's No Spark Zone requirements. <br /> <br />(i) The tower and accompanying appurtenances shall be constructed as <br />outlined in the approved site plan. The project must be formally reviewed <br />through the Site Plan Review Process. <br /> <br />(j) Advertising and signs will not be attached to the tower. Towers not subject <br />to federal requirements will have a gray, galvanized or other appropriate <br />finish. Towers subject to federal regulations shall be painted in <br />accordance with FCC or FAA requirements. <br /> <br />(k) No markings or lighting shall be utilized on the tower unless required by <br />the Federal Aviation Administration (FAA). <br /> <br />(I) Prior to the issuance of a building permit, the applicant shall submit plans <br />to the City Building Official, certified by a qualified professional engineer, <br />that the tower will meet all requirements of the Statewide Building Code. <br /> <br />(m) The applicant shall comply with the submitted Radio Frequency (RF) <br />Emissions Report of which details the proposed levels of non- <br />electromagnetic radiation emitted from the proposed tower and ensures <br />that the radiation levels will not exceed ground level exposure standards <br />established by the Federal Communications Commission (FCC) and other <br />U.S. Government Agencies. <br /> <br />(n) The applicant shall be responsible for resolving any interference the <br />facility causes to any equipment such as radios, televisions, cellular <br />phones, computers, etc. operated by users within the area. <br /> <br />(0) The use permit shall become null and void if the tower is unused or <br />becomes obsolete. In the event the use permit becomes void, the tower <br />shall be removed within twelve months. <br />
The URL can be used to link to this page
Your browser does not support the video tag.