My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2003 Resolutions
Portsmouth-City-Attorney
>
RESOLUTIONS
>
2003
>
2003 Resolutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2009 3:35:14 PM
Creation date
5/15/2003 5:12:45 PM
Metadata
Fields
Template:
Ord/Resolutions
Year
2003
Ord/Resolutions - Type
Resolutions
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
209
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(e) The operator shall maintain a logbook tracking the arrival and removal of <br /> all vehicles. Upon arrival all vehicles shall be logged in and immediately <br /> emptied of all gasohne, oil, radiator coolants, freon, and other fluids <br /> before being offered for salvage. All removed fluids shall be disposed of <br /> in accordance with applicable laws and regulations. <br /> <br /> (f) No vehicle shall remain on site in excess of ninety (90) days. <br /> <br /> (g) Upon arrival all miscellaneous scrap and trash shall be removed from <br /> vehicles and disposed of before being offered for salvage. <br /> <br /> (h) There shall be no storage of rimless tires on-site. <br /> <br /> (i) All vehicles before being offered for salvage shall be placed on <br /> elevated stands to keep vehicles off the ground and shall be arranged in <br /> lines and aisles as to offer a neat and orderly appearance. The arrangement <br /> of the vehicles shall be clearly shown on the site plan. <br /> <br /> (j) A combination of shrubs, and medium and large deciduous and evergreen <br /> trees shall be planted and maintained along the public right-of-way and <br /> along the southern property line to provide adequate buffer and screening <br /> in accordance with the landscaping plan. The Director of Plarming and <br /> Zoning shall approve modifications, as necessary, to ensure adequate <br /> screening of the facility. <br /> <br /> (k) The facility shall be fenced with an 8' high, 90% opaque fence as shown <br /> on the site plan. Landscaping shall be planted and maintained in front of <br /> all portions of the fence that are visible from Elm Avenue and the parking <br /> lot. <br /> <br /> (l) The operator of the facility shall protect the required Chesapeake Bay <br /> buffer strip to be established along Paradise Creek as per the Landscape <br /> Screening Exhibit. <br /> <br /> (m) All storm water run-off collection features and best management practice <br /> storage facilities shall be approved by the Director of Pubtic Works during <br /> the site plan review process prior to construction. The operator of the <br /> facility shall momtor and maintain the storm water system so as to protect <br /> against the spread of contaminants. The storm water facilities shall be <br /> available for routine monitoring at the request of city staff. <br /> <br /> (n) No open burning of any kind shall be conducted at the facility. <br /> <br /> (o) The hours of operation shall be limited to 8 A.M. to 7 P.M. dally. <br /> <br /> (p) No vegetation shall be permitted to grow in the vehicle storage area. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.