My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1980 Ordinances
Portsmouth-City-Attorney
>
ORDINANCES
>
1980
>
1980 Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/17/2001 6:40:34 PM
Creation date
6/26/2001 5:01:10 PM
Metadata
Fields
Template:
Ord/Resolutions
Year
1980
Ord/Resolutions - Type
Ordinances
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
154
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
AN ORDINANCE TO A~ND SECTION 6-8 (SECTION 118.9) OF THE <br />CODE OF THE CITY OF PORTSMOUTH, VIRGINIA, 1973, PERTAINING <br />TO SCHEDULE OF ELECTRICAL FEES. <br /> <br /> BE IT ORDAINED by the Council of the City of Portsmouth, <br />Virginia: <br /> <br /> !. That Section 6-8 (Section <br />City of Portsmouth, Virginia, 1973, <br />to read as follows: <br /> <br />118.9) of the Code of the <br />be amended and reordained <br /> <br />Section 118.9. Schedule of electric fees established. <br /> <br /> The schedule of fees for the inspection of electrical <br />wiring shall be as follows: <br /> <br />(1) Minim-~mpermit fee~ ................. $t0.00 <br />(2) Temporary service ... 60 amps ...... 10.O0 <br /> Temporary service ... 1OO amps ...... 15.00 <br /> <br />(3) (a) <br /> <br />Fees for new services whether single or three <br />phase includes all circuits, motors, generators <br />and other derivations of an electrical system. <br />Single phase fee is $15.O0 per 50 amps. <br /> <br />(b) <br /> <br />Three Phase Service fee is $20.00 per 50 amps. <br />for first 1000 amps. and $10.00 per 50 amps. for <br />remaining amps after 1000. <br /> <br />(4) <br /> <br />(a) <br /> <br />Changes of Service (old). Fees for changes of <br />service (pay for change of service and any <br />additional circuits added or worked on) are <br />$7.50 per 50 amps for single phase. For circuit <br />fee, see additions or repairs schedule below. <br /> <br />(b) <br /> <br />Changes of Service (old). Fees for changes of <br />service are $10.00 per 50 amps for the first <br />1,OOO amps. and $5.00 per 50 amps for the re- <br />maining amps after 1,000. <br /> <br /> (5) Additions or Repairs: For each piece of equipment <br />connected and for Bach circuit or feeder installed, extended, <br />relocated or repaired the fee shall be: <br /> <br />A~4PHERES CONDUCTOR SIZE FEE <br /> <br />O-31 ~14, 14, lO <br />31-60 amps. ~ 8, 4 <br />61-100 amps. ~ 4, 3, 2 <br />101-200 amps. ~ 1, O, O0, OOO <br />over 200 amps. over 000 <br /> <br />S3.OO per circuit <br />4.00 per circuit <br />5.00 per circuit <br />10.00 per circuit <br />15.00 Der circuit <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.