Laserfiche WebLink
99 <br /> <br />A RE$OLUTION REQUESTING THE VIRGINIA DEPART}~NT OF HIGHWAYS <br />TO. APPROVE A PROJECT FOR THE REPLACEMENT OF THE HODGES FERRY <br />'BRIDGE AND A PORTION OF STATE ROUTE 337. <br /> <br /> WHEREAS, the Council of the City of Portsmouth has de- <br />termined that there is a great need-for the replacement of the - <br />bridge carrying State Route 337 over the western branch of the <br />Elizabeth River (Hodges Ferry Bridge), and the western approach <br />thereto; and <br /> <br /> WHEREAS, the structural integrity of said bridge has <br />deteriorated to such an extent that it has become necessary to <br />limit the gross weight on said bridge to eight tons; and <br /> <br /> WHEREAS, the present width of said bridge is inadequate <br />to handle current traffic volumes; and <br /> <br /> WHEREAS, that portion of State Route 337 to the west <br />of such bridge is also inadequate to carry current traffic <br />volumes; and <br /> <br /> WF~REAS, the Hodges Ferry Bridge and said western ap- <br />proach thereto is a vital transportation link for the citizens <br />of Portsmouth in both their travels to Chesapeake and to the <br />Churchland area of Portsmouth; and <br /> <br /> WHEREAS, the proposed extension of Tyre Neck Road from <br />Bruce Road to Portsmouth Boulevard (State Route 337) will fur- <br />ther encourage citizens of Portsmouth and Chesapeake to use <br />said bridge; <br /> <br /> NOW, Thq~REFORE, BE IT RESOLVED that the Council of the <br />City of Portsmouth does hereby request the Virginia Department <br />of Highways to approve a project for the replacement of the <br />Hodges Ferry Bridge with a modern four-lane span and the re- <br />construction of State Route 337 from the Hodges Ferry BridQe <br />westward to a point approximately one-tenth of a mile west of <br />Taylor Road. <br /> <br /> BE IT FURT~LER RESOLVED that said road reconstruction <br />~hould consist of a four-lane divided highway with appropriate <br />turning storage lanes at Dock Landing Road and Taylor Road. <br /> <br /> BE IT FURTHER RESOLVED that the City of Portsmouth <br />shall pay fifteen percent (15%) of the cost of those portions <br />of the project constructed within the corporate boundaries of <br />Portsmouth. <br /> <br /> <br />