My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1991 Ordinances
Portsmouth-City-Attorney
>
ORDINANCES
>
1991
>
1991 Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2009 3:41:02 PM
Creation date
6/14/2001 5:14:46 PM
Metadata
Fields
Template:
Ord/Resolutions
Year
1991
Ord/Resolutions - Type
Ordinances
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
357
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Sec. 14-12. Design criteria for public improvements. <br /> <br /> (a) Sanitary Sewer Facilities - All new or replacement sanitary sewer facilities <br />and private package sewage treatment plants, including all pumping stations and <br />collector systems, shall be designed to minimize or eliminate infiltration of flood waters <br />into the systems and of discharges from the systems into the flood waters. The facilities <br />and plants shall be located and constructed to minimize or eliminate flood damage and <br />impairment. <br /> <br /> (b) Water Facilities - All new or replacement water facilities shall bedesigned <br />to minimize or eliminate infiltration of flood waters into the system and shallbe located <br />and constructed to minimize or eliminate flood damage. <br /> <br /> (c) Drainage Facilities - All storm drainage facilities shall be designed ;to convey <br />the flow of surface waters without causing injury to persons or damage to property. The <br />facilities shall ensure drainage awayfrom buildings and onsite waste disposal sites. The <br />city engineer may require a primary underground system to accommodate frequent <br />floods and a secondary surface system to accommodate larger, less frequent floods. <br />Drainage plans shall be consistent with local and regional drainage plans. The facilities <br />shall be designed to prevent the discharge of excess runoff onto adjacent properties. <br /> <br /> (d) Utilities - All utilities, such as gas lines, electrical ano telephone systems <br />being placed in flood-prone areas should be located, elevated (where possible), and <br />constructed to minimize the chance of im ~3airment during a flooding occurrence. <br /> <br /> (e) Streets and Sidewalks - Streets and sidewalks should be designed to <br />minimize their potential for increasing and aggravating the levels of flood flow. Drainage <br />openings shall be designed to reduce exposure to flood hazards. <br /> <br />ARTICLE V - VARIANCES <br /> <br />Sec. 14-13. Variances; factors to be considered. <br /> <br /> (a) In reviewing applications for variances, the board of zoning apca~ats shall <br />observe all requirements and procedures set out in of the zoning ordinance and shall <br />also consider the following factors: <br /> <br />(1) <br /> <br />The potential danger to life and property due to increased flood <br />heights or velocities caused by encroachments. No variance shall <br />be granted for any proposed use, development, or activitywithin the <br />floodplain distdct that will cause any increase in the one hundred- <br />year flood elevation. <br /> <br />(2) The potential danger that materials may be swept on to other lands <br /> or downstream to the injury of others. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.