My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1996 Resolutions
Portsmouth-City-Attorney
>
RESOLUTIONS
>
1996
>
1996 Resolutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2009 3:36:23 PM
Creation date
6/11/2001 5:37:53 PM
Metadata
Fields
Template:
Ord/Resolutions
Year
1996
Ord/Resolutions - Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
200
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
2. That a group housing use permit for the construction <br />of ninety-two apartment units on Tejo Lane, Portsmouth, <br />Virginia, is hereby granted to the applicant, Towne <br />Development Corporation, subject to the following terms and <br />conditions: <br /> <br /> (a) The group housing project shall be limited to six <br />buildings containing a total of ninety-two apartment units. <br /> <br /> (b) The project shall be constructed with full brick <br />front facades below the large gables of the front and rear <br />sides of each building. Vinyl "cedar shakes" shall be employed <br />on all gable areas on the front and rear faces of each <br />building, as shown on the attached Exhibit A. Buildings A and <br />F shall have full brick facades on their sides facing Tejo <br />Lane. A revised plan showing the placement of brick shall be <br />approved by the Director of Planning prior to the issuance of <br />any building permits. <br /> <br /> (c) A landscaping plan shall be developed in accordance <br />with the attached Exhibit B. All exterior utility cabinets <br />(including the air conditioning units) shall be landscaped. A <br />landscaping plan showing shrubs around the building foundations <br />shall be submitted to the Planning Department for review and <br />approval prior to the issuance of any building permits. <br /> <br /> (d) Adequate lighting shall be installed in the parking <br />area. A plan showing the lighting layout shall be submitted <br />by the applicant and approved by the Traffic Engineer prior to <br />issuance of any building permits. <br /> <br /> (e) The site plan shall be developed in accordance with <br />the attached Exhibit C. <br /> <br /> (f) Any revisions to the site plan, to the landscaping <br />plan, or to any elevation made through the group housing <br />application process, including any changes in response to any <br />requirements by the City Council, must be submitted to the <br />Planning Department for review and approval prior to the <br />issuance of any building permits. <br /> <br /> (g) The applicant shall be responsible for the cost of <br />upgrading utilities required for the construction and <br />operation of this project. <br /> <br /> (h) The applicant and any successor in interest shall <br />comply with all applicable statutes, ordinances and regulations <br />of federal, state and local governments and shall obtain and <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.