My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1997 Resolutions
Portsmouth-City-Attorney
>
RESOLUTIONS
>
1997
>
1997 Resolutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2009 3:36:13 PM
Creation date
6/8/2001 5:29:52 PM
Metadata
Fields
Template:
Ord/Resolutions
Year
1997
Ord/Resolutions - Type
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
144
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
(e) The use permit shall become void if the <br /> tower becomes unused or obsolete. In the <br /> event that the permit becomes void, the <br /> tower shall be removed within 12 months. <br /> <br /> (f) No signs or advertising may be attached <br /> the tower. <br /> <br /> (g) Accessory facilities associated with any <br /> antennas attached to the tower may be <br /> located in an existing building on the <br /> property. Prior to installing any <br /> equipment, improvements must be made to the <br /> building so that it meets the minimum <br /> requirements of City Code. <br /> <br /> (h) Prior to issuance of a building permit, the <br /> applicant must submit plans to the Building <br /> Official, certified by a qualified <br /> professional engineer, that the tower will <br /> meet all requirements of the building code <br /> and the requirements of EIA-222F, Structural <br /> Standards for Steel Antenna Towers and <br /> Antenna Supporting Structures. <br /> <br /> (i) Prior to issuance of a building permit, the <br /> applicant must provide the Director of <br /> Planning with a statement from a qualified <br /> professional engineer, that the <br /> non-electromagnetic radiation (NICER) <br /> emitted from the proposed facility, and any <br /> adjacent facilities, will not result in <br /> ground level exposures exceeding standards <br /> established by any U.S. Government Agency <br /> and the American Standards Institute. <br /> <br /> (j) The tower, any accessory building or <br /> structure, and any parking area shall be <br /> screened by a Landscaping Group 3 buffer as <br /> defined in the City of Portsmouth Zoning <br /> Ordinance. The nature and location of the <br /> required buffer shall be established by a <br /> landscaping plan which must be submitted to <br /> the City's Division of Planning and Zoning <br /> and approved prior to the commencement of <br /> construction of the tower. At all material <br /> times during the use of the tower and the <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.