Laserfiche WebLink
(e) The use permit shall become void if the <br /> tower becomes unused or obsolete. In the <br /> event that the permit becomes void, the <br /> tower shall be removed within 12 months. <br /> <br /> (f) No signs or advertising may be attached <br /> the tower. <br /> <br /> (g) Accessory facilities associated with any <br /> antennas attached to the tower may be <br /> located in an existing building on the <br /> property. Prior to installing any <br /> equipment, improvements must be made to the <br /> building so that it meets the minimum <br /> requirements of City Code. <br /> <br /> (h) Prior to issuance of a building permit, the <br /> applicant must submit plans to the Building <br /> Official, certified by a qualified <br /> professional engineer, that the tower will <br /> meet all requirements of the building code <br /> and the requirements of EIA-222F, Structural <br /> Standards for Steel Antenna Towers and <br /> Antenna Supporting Structures. <br /> <br /> (i) Prior to issuance of a building permit, the <br /> applicant must provide the Director of <br /> Planning with a statement from a qualified <br /> professional engineer, that the <br /> non-electromagnetic radiation (NICER) <br /> emitted from the proposed facility, and any <br /> adjacent facilities, will not result in <br /> ground level exposures exceeding standards <br /> established by any U.S. Government Agency <br /> and the American Standards Institute. <br /> <br /> (j) The tower, any accessory building or <br /> structure, and any parking area shall be <br /> screened by a Landscaping Group 3 buffer as <br /> defined in the City of Portsmouth Zoning <br /> Ordinance. The nature and location of the <br /> required buffer shall be established by a <br /> landscaping plan which must be submitted to <br /> the City's Division of Planning and Zoning <br /> and approved prior to the commencement of <br /> construction of the tower. At all material <br /> times during the use of the tower and the <br /> <br /> <br />