My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1998 Ordinances
Portsmouth-City-Attorney
>
ORDINANCES
>
1998
>
1998 Ordinances
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2009 3:39:43 PM
Creation date
6/8/2001 5:14:46 PM
Metadata
Fields
Template:
Ord/Resolutions
Year
1998
Ord/Resolutions - Type
Ordinances
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
173
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4. For a valuation from twenty thousand dollars t$20,000.00) up to and <br /> including ninety-nine thousand nine hundred ninety-nine dollars <br /> ($99,999.00), the fee shall be two hundred fifty dollars ($250.00) for the <br /> first twenty thousand dollars $20,000.00 plus five dollars ($5.00) for <br /> each additional thousand dollars ($1,000.00) or fraction thereof <br /> <br /> 5. For a valuation of over one hundred thousand dollars ($100,000.00), the <br /> fee shall be six hundred twenty-five dollars ($625.00) for the first one <br /> hundred thousand dollars ($100,000.00) plus four dollars ($4.00) for each <br /> additional thousand dollars ($1,000.00) or fraction thereof, without limit. <br /> <br /> b. Tents, Mobile Homes and Other Temporary Structures <br /> <br /> 1. For tents and other temporary structures, the fee shall be twenty-five <br /> dollars ($25.00) each. <br /> <br /> 2. For the new placement of mobile homes on a site including the fie-down <br /> and foundation, the fee shall be thirty-five dollars ($35.00). <br /> <br /> 3. For the replacement of mobile homes on a site including the tie-down and <br /> foundation, the fee shall be thirty dollars ($30.00). <br /> <br />Sec. 7-133. Same--Electrical permits and inspections. <br /> <br />(a) The fees for electrical permits shall be as follows: <br /> <br />(1) Minimum permit fee .......... $25.00 <br /> <br />(2) Temporary service, 60 amperes.. 25.00 <br /> <br />Temporary service, 100 amperes ........ 30.00 <br /> <br />(3) a. Fees for new services whether single-or three-phase include all circuits, motors, <br /> generators and other derivations of an electrical system. Single-phase fee is <br /> $25.00 per 50 amperes. <br /> <br /> b. Three-phase service fee is $30.00 per 50 amperes for first 1,000 amperes and <br /> $15.00 per 50 amperes for remaining amperes after 1,000. <br /> <br />(4) a. Changes of service (old): For single phase service. Fees for changes of service <br /> (pay for change of service and any additional circuits added or worked on) are $12.50 <br /> per 50 amperes for single phase. For circuit fee, see additions or repairs schedule <br /> below. <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.