My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2001 Resolutions
Portsmouth-City-Attorney
>
RESOLUTIONS
>
2001
>
2001 Resolutions
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/6/2009 3:35:39 PM
Creation date
6/5/2001 5:25:23 PM
Metadata
Fields
Template:
Ord/Resolutions
Year
2001
Ord/Resolutions - Type
Resolutions
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
267
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
UP-O0-18 <br /> <br /> Beginning at a point 60'+/- west of the southeast comer <br />of the intersection of Hamilton Avenue and Columbia Street; <br />thence, east 380'+/- to a point; thence, in a southwesterly <br />direction 95'+/- to a point; thence, south 10'+/- to a point; thence, <br />in a southwesterly direction 215'+/- to a point; thence, west <br />225'+/- to a point; thence, north 275'+/- to the point of the <br />beginning. <br /> <br /> 3. That the use permit is approved subject to the following conditions: <br /> <br /> (a) The tower shall not exceed 125 feet in height and shall be located 125 feet <br /> from any adjacent property line. <br /> <br /> (b) No markings or lighting shall be utilized on the tower unless required by <br /> the Federal Aviation Administration (FAA). <br /> <br /> (c) The style of the tower shall be a monopole steel tower that can <br /> accommodate an additional user and shall be constructed on one of the <br /> locations identified as Alternative A and Alternative B on the applicant's <br /> site plan, labeled Exhibit A and attached hereto. <br /> <br /> (d) The existing obsolete communication tower shall be removed within <br /> twelve months of commencement of use of the new monopole tower. <br /> <br /> (e) The use permit shall become void if the tower ceases to be used or <br /> becomes obsolete, and the tower shall be removed at the expense of the <br /> applicant within twelve months of the date of such event. <br /> <br /> (f) Prior to the issuance of a building permit, the applicant shall submit plans <br /> to the Building Official, certified by a qualified professional engineer, that <br /> the tower will meet all requirements of the Building Code. <br /> <br /> (g) Prior to the issuance of a building permit, the applicant must provide a <br /> report from a qualified professional engineer regarding the levels of non- <br /> electromagnetic radiation (NIER) emitted from the proposed facility and <br /> any adjacent facilities. The report shall show the radiation levels will not <br /> exceed ground level exposures exceeding standards established by any <br /> U.S. Government Agency and the American Standards Institute. <br /> <br /> (h) The applicant shall be responsible for resolving any reception or broadcast <br /> interference that the facility causes to any equipment such as radios, <br /> <br /> <br />
The URL can be used to link to this page
Your browser does not support the video tag.